Efficient and energy-saving steel-concrete structure building modular construction method
The invention belongs to the technical field of energy-saving building modular construction, and particularly relates to an efficient and energy-saving steel-concrete structure building modular construction method which comprises the following steps that S1, an embedded part is installed on a foundation in advance, and the upper side of a wall and a tower crane are connected in a hoisting mode through a hoisting mechanism; s2, the wall body is hoisted to the upper side of the embedded part, the bottom of the wall body is aligned with the embedded part for insertion, and the inclination angle of the wall body is adjusted, so that the wall body is vertically fixed; and S3, a foaming agent is injected into the position between the wall body and the embedded part for filling, the side face of the wall body is supported and fixed through a supporting rod, and connection between the hoisting mechanism and the wall body is relieved. While the modular assembling efficiency of the wall body is conveniently improved, the gap between the wall body and the embedded steel bars can be automatically and efficiently filled.
本发明属于节能型建筑模块化施工技术领域,具体涉及一种高效节能的钢混结构建筑模块化施工方法,包括以下步骤:S1、在地基上预先安装好预埋件,通过吊装机构将墙体的上侧与塔吊进行吊装连接;S2、将墙体吊运至预埋件的上侧,墙体底部对准预埋件进行插入,调节墙体的倾斜角度,使得墙体呈垂直状进行固定;S3、对墙体与预埋件之间的位置注入发泡剂进行填充,将墙体的侧面通过支撑杆进行支撑固定,解除吊装机构与墙体之间的连接。本发明在便于提升墙体模块化组装效率的同时,能够自动对墙体与预埋钢筋之间的间隙进行高效填充。
Efficient and energy-saving steel-concrete structure building modular construction method
The invention belongs to the technical field of energy-saving building modular construction, and particularly relates to an efficient and energy-saving steel-concrete structure building modular construction method which comprises the following steps that S1, an embedded part is installed on a foundation in advance, and the upper side of a wall and a tower crane are connected in a hoisting mode through a hoisting mechanism; s2, the wall body is hoisted to the upper side of the embedded part, the bottom of the wall body is aligned with the embedded part for insertion, and the inclination angle of the wall body is adjusted, so that the wall body is vertically fixed; and S3, a foaming agent is injected into the position between the wall body and the embedded part for filling, the side face of the wall body is supported and fixed through a supporting rod, and connection between the hoisting mechanism and the wall body is relieved. While the modular assembling efficiency of the wall body is conveniently improved, the gap between the wall body and the embedded steel bars can be automatically and efficiently filled.
本发明属于节能型建筑模块化施工技术领域,具体涉及一种高效节能的钢混结构建筑模块化施工方法,包括以下步骤:S1、在地基上预先安装好预埋件,通过吊装机构将墙体的上侧与塔吊进行吊装连接;S2、将墙体吊运至预埋件的上侧,墙体底部对准预埋件进行插入,调节墙体的倾斜角度,使得墙体呈垂直状进行固定;S3、对墙体与预埋件之间的位置注入发泡剂进行填充,将墙体的侧面通过支撑杆进行支撑固定,解除吊装机构与墙体之间的连接。本发明在便于提升墙体模块化组装效率的同时,能够自动对墙体与预埋钢筋之间的间隙进行高效填充。
Efficient and energy-saving steel-concrete structure building modular construction method
一种高效节能的钢混结构建筑模块化施工方法
SONG SHICHUN (author) / ZHANG NAN (author) / GAO LEIXING (author) / LI DAPENG (author) / WANG NAIXUN (author)
2024-06-14
Patent
Electronic Resource
Chinese
Efficient and energy-saving concrete grouting equipment for building construction
European Patent Office | 2022
|Energy-saving fabricated steel structure building and construction method
European Patent Office | 2024
European Patent Office | 2024
|Efficient and energy-saving grouting process of concrete for building construction
European Patent Office | 2022
|Construction method of building structure and concrete modular building structure
European Patent Office | 2024
|