A platform for research: civil engineering, architecture and urbanism
Assembly type prefabricated concrete frame and steel hook assembling and mounting structure
The invention discloses an assembly type prefabricated concrete frame and steel hook assembly and installation structure, and relates to the technical field of buildings, the assembly type prefabricated concrete frame and steel hook assembly and installation structure comprises a frame body, and two installation grooves are formed in the top of the frame body. When the device is used, the conical blades are aligned to the first protective films and pierce the first protective films, the filling block is rotated, the two conical blades are driven to rotate, the two first protective films are ripped, when the conical blades fall into the insertion holes, the filling block makes contact with the first protective films, at the moment, a chemical anchoring agent in the first protective films flows between the filling block and the reinforcing plate, the sliding block is pushed to move, and the filling block is inserted into the insertion holes. The cutting edges penetrate into the second protective film, then the two ends of the stirring strip are inserted into the two arc-shaped holes, the stirring strip is rotated, the two sliding blocks are driven to rotate, the two cutting edges are driven to rotate, the second protective film is ripped, the chemical anchoring agent flows to the position between the filling block and the inner wall of the mounting groove, firm connection is formed, and the mounting groove is filled.
本发明公开了一种装配式预制混凝土框架与钢钩装配安装结构,涉及建筑技术领域,包括:框架本体,所述框架本体的顶部开设有两个安装槽。本发明使用时,将锥形刃对准第一保护膜,并刺入其中,转动填补块,带动两个锥形刃转动,将两个第一保护膜划开,当锥形刃落到插孔中时,填补块与第一保护膜接触,此时第一保护膜内部的化学锚固剂流到填补块和加强板之间,推动滑块移动,将刀刃刺入第二保护膜中,然后将拨动条的两端插到两个弧形孔中,通过转动拨动条,带动两个滑块转动,并带动两个刀刃转动,将第二保护膜划开,使化学锚固剂流到填补块与安装槽内壁之间,形成坚固的连接,对安装槽进行填补。
Assembly type prefabricated concrete frame and steel hook assembling and mounting structure
The invention discloses an assembly type prefabricated concrete frame and steel hook assembly and installation structure, and relates to the technical field of buildings, the assembly type prefabricated concrete frame and steel hook assembly and installation structure comprises a frame body, and two installation grooves are formed in the top of the frame body. When the device is used, the conical blades are aligned to the first protective films and pierce the first protective films, the filling block is rotated, the two conical blades are driven to rotate, the two first protective films are ripped, when the conical blades fall into the insertion holes, the filling block makes contact with the first protective films, at the moment, a chemical anchoring agent in the first protective films flows between the filling block and the reinforcing plate, the sliding block is pushed to move, and the filling block is inserted into the insertion holes. The cutting edges penetrate into the second protective film, then the two ends of the stirring strip are inserted into the two arc-shaped holes, the stirring strip is rotated, the two sliding blocks are driven to rotate, the two cutting edges are driven to rotate, the second protective film is ripped, the chemical anchoring agent flows to the position between the filling block and the inner wall of the mounting groove, firm connection is formed, and the mounting groove is filled.
本发明公开了一种装配式预制混凝土框架与钢钩装配安装结构,涉及建筑技术领域,包括:框架本体,所述框架本体的顶部开设有两个安装槽。本发明使用时,将锥形刃对准第一保护膜,并刺入其中,转动填补块,带动两个锥形刃转动,将两个第一保护膜划开,当锥形刃落到插孔中时,填补块与第一保护膜接触,此时第一保护膜内部的化学锚固剂流到填补块和加强板之间,推动滑块移动,将刀刃刺入第二保护膜中,然后将拨动条的两端插到两个弧形孔中,通过转动拨动条,带动两个滑块转动,并带动两个刀刃转动,将第二保护膜划开,使化学锚固剂流到填补块与安装槽内壁之间,形成坚固的连接,对安装槽进行填补。
Assembly type prefabricated concrete frame and steel hook assembling and mounting structure
一种装配式预制混凝土框架与钢钩装配安装结构
LI JINGJING (author)
2024-06-14
Patent
Electronic Resource
Chinese
Prefabricated assembly type steel-concrete part mounting device
European Patent Office | 2023
|Assembly type concrete stair prefabricated part assembling structure
European Patent Office | 2022
|Assembly type prefabricated steel-concrete structure standard part and assembling method
European Patent Office | 2022
|Fully-prefabricated concrete-filled steel tube frame structure and assembling method
European Patent Office | 2021
|