CAP reactor-shaped nuclear power station reactor building synchronization method construction method
The invention discloses a CAP reactor-shaped nuclear power station reactor building synchronization method building method, which comprises the following steps: arranging a transportation assembly tool on a temporary assembly site, building a reactor module on the transportation assembly tool, carrying out reactor building internal structure construction, and carrying out partial construction of a lower foundation structure of the reactor building module at a nuclear island designated position, building a module transportation channel from the temporary assembly site to the designated position of the nuclear island in advance, and enabling the lower foundation structure of the partially constructed reactor building module to be communicated with the module transportation channel so as to transport the reactor module; after the reactor module is built, the reactor module is transported to the designated position of the nuclear island through the module transportation channel by adopting a transport vehicle, and after the reactor module is reinforced, other constructions of the lower foundation structure of the reactor building module are carried out. The optimized construction scheme of the reactor building of the CAP reactor-shaped nuclear power station is comprehensively designed, and the construction period is shortened.
本发明公开了一种CAP堆形核电站反应堆厂房同步法建造方法,在临时拼装场地上布置运输拼装工装,在运输拼装工装上建造反应堆模块并进行反应堆厂房内部结构施工,同时在核岛指定位置进行反应堆厂房模块下部基础结构的部分施工,并提前建造从临时拼装场地至在核岛指定位置的模块运输通道,使部分施工的反应堆厂房模块下部基础结构与模块运输通道连通以运输反应堆模块;反应堆模块建造完成后采用运输车辆通过模块运输通道运输至核岛指定位置,对反应堆模块进行加固后进行反应堆厂房模块下部基础结构的其余施工。本发明综合设计了CAP堆形核电站反应堆厂房优化施工方案,缩短施工周期。
CAP reactor-shaped nuclear power station reactor building synchronization method construction method
The invention discloses a CAP reactor-shaped nuclear power station reactor building synchronization method building method, which comprises the following steps: arranging a transportation assembly tool on a temporary assembly site, building a reactor module on the transportation assembly tool, carrying out reactor building internal structure construction, and carrying out partial construction of a lower foundation structure of the reactor building module at a nuclear island designated position, building a module transportation channel from the temporary assembly site to the designated position of the nuclear island in advance, and enabling the lower foundation structure of the partially constructed reactor building module to be communicated with the module transportation channel so as to transport the reactor module; after the reactor module is built, the reactor module is transported to the designated position of the nuclear island through the module transportation channel by adopting a transport vehicle, and after the reactor module is reinforced, other constructions of the lower foundation structure of the reactor building module are carried out. The optimized construction scheme of the reactor building of the CAP reactor-shaped nuclear power station is comprehensively designed, and the construction period is shortened.
本发明公开了一种CAP堆形核电站反应堆厂房同步法建造方法,在临时拼装场地上布置运输拼装工装,在运输拼装工装上建造反应堆模块并进行反应堆厂房内部结构施工,同时在核岛指定位置进行反应堆厂房模块下部基础结构的部分施工,并提前建造从临时拼装场地至在核岛指定位置的模块运输通道,使部分施工的反应堆厂房模块下部基础结构与模块运输通道连通以运输反应堆模块;反应堆模块建造完成后采用运输车辆通过模块运输通道运输至核岛指定位置,对反应堆模块进行加固后进行反应堆厂房模块下部基础结构的其余施工。本发明综合设计了CAP堆形核电站反应堆厂房优化施工方案,缩短施工周期。
CAP reactor-shaped nuclear power station reactor building synchronization method construction method
一种CAP堆形核电站反应堆厂房同步法建造方法
ZHAO YU (author) / ZHANG HONG (author) / WANG MINGTAO (author) / CHENG XIAOHUA (author) / BIE GANGGANG (author)
2024-06-14
Patent
Electronic Resource
Chinese
Construction of containment building for Gentilly nuclear power reactor
Engineering Index Backfile | 1969
|Electric rotary temporary roof for reactor building of nuclear power station
European Patent Office | 2015
|European Patent Office | 2023
|