Ballast track base disease treatment construction method
The invention provides a ballast track base disease treatment construction method. The method comprises the steps that construction preparation is made; the feet-lock anchor pipe is constructed; driving a row of locking anchor pipes, firstly utilizing the skylight, constructing the locking anchor pipe on the right side of the disease section, then utilizing the skylight, and completing the rest of the locking anchor pipes; rail breaking construction is conducted, and the upward steel rail is sawed through a skylight; carrying out cable and drainage relocation and construction, and carrying out temporary buttress driving construction; carrying out sleeper displacement, railway ballast cleaning and steel sleeper beam erection construction; dismantling the base plate and restoring construction; then steel template beam dismantling and track resetting construction are carried out, and seamless welding and fine adjustment are carried out on the steel rails; and recovering the ditch bottom cable trough.
本发明提出了一种有砟轨道基底病害整治施工方法,包括做好施工准备;锁脚锚管施工;锁脚锚管打设一排,先利用天窗,施工病害区段右侧锁脚锚管,完毕后再利用天窗,完成剩余锁脚锚管;进行断轨施工,利用天窗对上行钢轨进行锯轨;进行线缆、排水迁改、临时支墩打设施工;进行轨枕移位、道砟清理以及钢垫梁架设施工;底座板拆除及恢复施工;之后进行钢垫梁拆除及轨道复位施工,并对钢轨无缝焊接、精调;进行水沟底电缆槽恢复。
Ballast track base disease treatment construction method
The invention provides a ballast track base disease treatment construction method. The method comprises the steps that construction preparation is made; the feet-lock anchor pipe is constructed; driving a row of locking anchor pipes, firstly utilizing the skylight, constructing the locking anchor pipe on the right side of the disease section, then utilizing the skylight, and completing the rest of the locking anchor pipes; rail breaking construction is conducted, and the upward steel rail is sawed through a skylight; carrying out cable and drainage relocation and construction, and carrying out temporary buttress driving construction; carrying out sleeper displacement, railway ballast cleaning and steel sleeper beam erection construction; dismantling the base plate and restoring construction; then steel template beam dismantling and track resetting construction are carried out, and seamless welding and fine adjustment are carried out on the steel rails; and recovering the ditch bottom cable trough.
本发明提出了一种有砟轨道基底病害整治施工方法,包括做好施工准备;锁脚锚管施工;锁脚锚管打设一排,先利用天窗,施工病害区段右侧锁脚锚管,完毕后再利用天窗,完成剩余锁脚锚管;进行断轨施工,利用天窗对上行钢轨进行锯轨;进行线缆、排水迁改、临时支墩打设施工;进行轨枕移位、道砟清理以及钢垫梁架设施工;底座板拆除及恢复施工;之后进行钢垫梁拆除及轨道复位施工,并对钢轨无缝焊接、精调;进行水沟底电缆槽恢复。
Ballast track base disease treatment construction method
一种有砟轨道基底病害整治施工方法
FU BINGXIAN (author) / ZHENG XINGUO (author) / MA WEIBIN (author) / MA CHAOFENG (author) / ZHAO PENG (author) / WEI SHAOWEI (author) / LI YAO (author) / LOU LIANGWEI (author) / ZOU WENHAO (author) / NIU YABIN (author)
2024-06-18
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
/
E21D
SHAFTS
,
Schächte
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
PACKING BALLAST TRACK CONSTRUCTION METHOD AND PACKING BALLAST TRACK
European Patent Office | 2022
|Ballast supplementing construction equipment and construction method for ballast track railway
European Patent Office | 2022
|European Patent Office | 2023
|BALLAST TRACK STRUCTURE AND METHOD FOR MANUFACTURING BALLAST TRACK STRUCTURE
European Patent Office | 2022
|BALLAST TRACK REPAIR METHOD, REPAIR MATERIAL THEREOF, AND BALLAST TRACK
European Patent Office | 2023
|