Dike breach rapid blocking method combining rocket anchor and pile planting technology
The invention provides a rapid dike breach plugging method combining rocket anchoring and pile planting technologies, and belongs to the technical field of dike breach plugging. The method comprises the following steps that firstly, a willow stone pillow is rapidly thrown, a wrapping head is built, and a broken embankment head is consolidated; step 2, quickly constructing an occupation body by combining rocket anchors, steel pipe piles, steel sheet piles, steel mesh gabions, geotechnical bags and large nylon nets, and creating favorable conditions for closure; and thirdly, after a proper closure condition is met, closure is carried out on the basis of the rocket anchor and pile planting technology, after closure is completed, the gap of the plugging body is filled with stone and soil, air closing is completed, and breach plugging is achieved. The method combines the advantages of rapid rooting of the rocket anchor, the steel pipe pile and the steel sheet pile in breach water flow and traditional plugging materials, adopts the willow stone pillows, the steel mesh gabions, the geotechnical bags, the large nylon nets, the stone materials and the soil materials for breach plugging, and has the characteristics of high construction speed, high plugging material environmental protection property, high stability, high sustainability and the like.
本发明提供一种联合火箭锚与植桩技术的堤防决口快速封堵方法,属于堤防决口封堵技术领域。该方法包括以下步骤:第一步、快速抛投柳石枕,修筑裹头,巩固断堤头;第二步、联合火箭锚、钢管桩、钢板桩、钢网石笼、土工包、大尼龙网快速构筑进占体,为合龙创造有利条件;第三步、达到适宜的合龙条件后,以火箭锚与植桩技术为基础实施合龙,合龙完成后,将石料、土料铺填至封堵体空隙处,完成闭气,实现决口封堵。本发明联合火箭锚、钢管桩、钢板桩在决口水流中快速“生根”与传统封堵材料的优点,采用柳石枕、钢网石笼、土工包、大尼龙网、石料、土料进行决口封堵,具有施工速度快、封堵材料环保性高、稳定性和可持续性强等特点。
Dike breach rapid blocking method combining rocket anchor and pile planting technology
The invention provides a rapid dike breach plugging method combining rocket anchoring and pile planting technologies, and belongs to the technical field of dike breach plugging. The method comprises the following steps that firstly, a willow stone pillow is rapidly thrown, a wrapping head is built, and a broken embankment head is consolidated; step 2, quickly constructing an occupation body by combining rocket anchors, steel pipe piles, steel sheet piles, steel mesh gabions, geotechnical bags and large nylon nets, and creating favorable conditions for closure; and thirdly, after a proper closure condition is met, closure is carried out on the basis of the rocket anchor and pile planting technology, after closure is completed, the gap of the plugging body is filled with stone and soil, air closing is completed, and breach plugging is achieved. The method combines the advantages of rapid rooting of the rocket anchor, the steel pipe pile and the steel sheet pile in breach water flow and traditional plugging materials, adopts the willow stone pillows, the steel mesh gabions, the geotechnical bags, the large nylon nets, the stone materials and the soil materials for breach plugging, and has the characteristics of high construction speed, high plugging material environmental protection property, high stability, high sustainability and the like.
本发明提供一种联合火箭锚与植桩技术的堤防决口快速封堵方法,属于堤防决口封堵技术领域。该方法包括以下步骤:第一步、快速抛投柳石枕,修筑裹头,巩固断堤头;第二步、联合火箭锚、钢管桩、钢板桩、钢网石笼、土工包、大尼龙网快速构筑进占体,为合龙创造有利条件;第三步、达到适宜的合龙条件后,以火箭锚与植桩技术为基础实施合龙,合龙完成后,将石料、土料铺填至封堵体空隙处,完成闭气,实现决口封堵。本发明联合火箭锚、钢管桩、钢板桩在决口水流中快速“生根”与传统封堵材料的优点,采用柳石枕、钢网石笼、土工包、大尼龙网、石料、土料进行决口封堵,具有施工速度快、封堵材料环保性高、稳定性和可持续性强等特点。
Dike breach rapid blocking method combining rocket anchor and pile planting technology
一种联合火箭锚与植桩技术的堤防决口快速封堵方法
PANG RUI (author) / WANG XIANGYU (author) / XU BIN (author) / ZHOU YANG (author)
2024-06-18
Patent
Electronic Resource
Chinese
Dike breach rapid occupation method based on blocking cooperation
European Patent Office | 2024
|Rapid blocking device for dike breach in water conservancy project construction
European Patent Office | 2021
|Efficient device for blocking dike breach and using method
European Patent Office | 2023
|