Dike breach rapid occupation method based on blocking cooperation
A rapid embankment breach occupation method based on blocking cooperation comprises the steps that (1) a rocket drilling anchor is used for forming an anchor array at the set position of a breach, a steel mesh gabion is thrown in a sliding mode through an anchor cable, then a steel pipe pile is implanted into the side, away from a river, of the steel mesh gabion, a soil engineering bag is thrown into a gap of the steel mesh gabion, and an anti-impact rock head is rapidly constructed; (2) stone and soil are put into gaps of the steel pipe piles, a construction site is created for throwing the soft mattresses, the multiple soft mattresses are put into the sides, away from the river, of the steel pipe piles, the soft mattresses are fixedly connected with the shoreside fixing piles and the steel pipe piles through ropes, and when the soft mattresses are away from the water surface by a certain height, the upper portions of the soft mattresses are filled with the stone and the soil to form a flow reducing and buffering anti-impact body; and (3) the large net bag is thrown to form an embankment breach occupation blocking body based on blocking cooperation, and rapid occupation of the embankment breach is achieved. The method is based on rocket ground drilling anchor and vibroflotation pile planting equipment, combines the advantages of various embankment breach occupation technologies, and has the characteristics of quick response to embankment breach occupation, adaptation to breaches of different types and scales, high stability, strong durability and the like.
一种基于阻拦协同的堤防溃口快速进占方法,步骤为:1)运用火箭钻地锚在溃口设定位置形成锚阵,通过锚索滑投钢网石笼,随后在钢网石笼的背河侧植入钢管桩,并将土工袋抛投至钢网石笼空隙处,快速构筑一道防冲矶头;2)将石料、土料投入钢管桩间隙之间,为抛投软体排创造施工场地,向钢管桩背河侧投放多个软体排,利用绳索将软体排与岸边固定桩、钢管桩连接固定,待软体排距离水面一定高度时在软体排上部填筑石料、土料,形成减流缓冲的抗冲体;3)抛投大网兜,形成基于阻拦协同的堤防溃口进占封堵体,实现堤防溃口快速进占。本发明立足火箭钻地锚和振冲植桩设备,联合多种堤防溃口进占技术的优点,具有快速响应堤防溃口进占、适应不同类型和规模的溃口、稳定性高、持久性强等特点。
Dike breach rapid occupation method based on blocking cooperation
A rapid embankment breach occupation method based on blocking cooperation comprises the steps that (1) a rocket drilling anchor is used for forming an anchor array at the set position of a breach, a steel mesh gabion is thrown in a sliding mode through an anchor cable, then a steel pipe pile is implanted into the side, away from a river, of the steel mesh gabion, a soil engineering bag is thrown into a gap of the steel mesh gabion, and an anti-impact rock head is rapidly constructed; (2) stone and soil are put into gaps of the steel pipe piles, a construction site is created for throwing the soft mattresses, the multiple soft mattresses are put into the sides, away from the river, of the steel pipe piles, the soft mattresses are fixedly connected with the shoreside fixing piles and the steel pipe piles through ropes, and when the soft mattresses are away from the water surface by a certain height, the upper portions of the soft mattresses are filled with the stone and the soil to form a flow reducing and buffering anti-impact body; and (3) the large net bag is thrown to form an embankment breach occupation blocking body based on blocking cooperation, and rapid occupation of the embankment breach is achieved. The method is based on rocket ground drilling anchor and vibroflotation pile planting equipment, combines the advantages of various embankment breach occupation technologies, and has the characteristics of quick response to embankment breach occupation, adaptation to breaches of different types and scales, high stability, strong durability and the like.
一种基于阻拦协同的堤防溃口快速进占方法,步骤为:1)运用火箭钻地锚在溃口设定位置形成锚阵,通过锚索滑投钢网石笼,随后在钢网石笼的背河侧植入钢管桩,并将土工袋抛投至钢网石笼空隙处,快速构筑一道防冲矶头;2)将石料、土料投入钢管桩间隙之间,为抛投软体排创造施工场地,向钢管桩背河侧投放多个软体排,利用绳索将软体排与岸边固定桩、钢管桩连接固定,待软体排距离水面一定高度时在软体排上部填筑石料、土料,形成减流缓冲的抗冲体;3)抛投大网兜,形成基于阻拦协同的堤防溃口进占封堵体,实现堤防溃口快速进占。本发明立足火箭钻地锚和振冲植桩设备,联合多种堤防溃口进占技术的优点,具有快速响应堤防溃口进占、适应不同类型和规模的溃口、稳定性高、持久性强等特点。
Dike breach rapid occupation method based on blocking cooperation
一种基于阻拦协同的堤防溃口快速进占方法
PANG RUI (author) / WANG XIANGYU (author) / XU BIN (author) / LIAN YANG (author) / CUI FENG (author) / WANG ZHE (author) / ZHANG FANGTING (author) / JIA XIANGTING (author) / ZHANG XIANG (author) / GUO QIUGE (author)
2024-06-25
Patent
Electronic Resource
Chinese
Rapid blocking device for dike breach in water conservancy project construction
European Patent Office | 2021
|Efficient device for blocking dike breach and using method
European Patent Office | 2023
|Dike breach rapid blocking method combining rocket anchor and pile planting technology
European Patent Office | 2024
|