Concrete-filled steel tube assembled and combined pier column
The invention relates to the field of pier columns, in particular to a concrete filled steel tube assembly combined pier column which comprises a plurality of pipe bodies connected in sequence, a first concrete layer is fixedly installed in each pipe body, a second concrete layer is fixedly installed on the outer wall of each pipe body, and a reinforcement cage is embedded in each second concrete layer. The pipe body is provided with a plurality of first reinforcing rods, the pipe body is provided with a plurality of through holes allowing the first reinforcing rods to penetrate through, rod bodies of the first reinforcing rods abut against the inner walls of the through holes, first limiting plates are installed on the rod bodies of the first reinforcing rods, and the first limiting plates are attached to the outer wall of the pipe body. The method has the effect of shortening the construction period.
本申请涉及墩柱的领域,尤其是涉及一种钢管混凝土拼装组合墩柱,其包括多根依次连接的管体,所述管体的内部固定安装有第一混凝土层,所述管体的外壁固定安装有第二混凝土层,所述第二混凝土层内部埋设有钢筋笼,所述管体设置有多根第一加强杆,所述管体开设有多个供第一加强杆穿设的通孔,所述第一加强杆的杆身抵贴于通孔的内壁,所述第一加强杆的杆身安装有第一限位板,所述第一限位板贴合于管体的外壁。本申请具有缩短施工周期的效果。
Concrete-filled steel tube assembled and combined pier column
The invention relates to the field of pier columns, in particular to a concrete filled steel tube assembly combined pier column which comprises a plurality of pipe bodies connected in sequence, a first concrete layer is fixedly installed in each pipe body, a second concrete layer is fixedly installed on the outer wall of each pipe body, and a reinforcement cage is embedded in each second concrete layer. The pipe body is provided with a plurality of first reinforcing rods, the pipe body is provided with a plurality of through holes allowing the first reinforcing rods to penetrate through, rod bodies of the first reinforcing rods abut against the inner walls of the through holes, first limiting plates are installed on the rod bodies of the first reinforcing rods, and the first limiting plates are attached to the outer wall of the pipe body. The method has the effect of shortening the construction period.
本申请涉及墩柱的领域,尤其是涉及一种钢管混凝土拼装组合墩柱,其包括多根依次连接的管体,所述管体的内部固定安装有第一混凝土层,所述管体的外壁固定安装有第二混凝土层,所述第二混凝土层内部埋设有钢筋笼,所述管体设置有多根第一加强杆,所述管体开设有多个供第一加强杆穿设的通孔,所述第一加强杆的杆身抵贴于通孔的内壁,所述第一加强杆的杆身安装有第一限位板,所述第一限位板贴合于管体的外壁。本申请具有缩短施工周期的效果。
Concrete-filled steel tube assembled and combined pier column
一种钢管混凝土拼装组合墩柱
WANG YAO (author) / WU LONGSHAN (author) / XU HONGGUANG (author) / ZHANG HENGCHUN (author) / JIANG NA (author) / WANG XUAN (author) / JIN GUANNAN (author) / CHEN DEJIN (author)
2024-06-21
Patent
Electronic Resource
Chinese
Assembled concrete-filled steel tube friction pendulum vibration isolation pier column
European Patent Office | 2020
|European Patent Office | 2023
|Accurate rib-free assembling system for combined patterned concrete-filled steel tube pier column
European Patent Office | 2023
|