A platform for research: civil engineering, architecture and urbanism
Construction pouring equipment for installing thermal insulation integrated plate
The embodiment of the invention relates to construction pouring equipment for installing a heat preservation integrated plate, relates to the technical field of buildings, and mainly aims to improve the construction efficiency of the heat preservation integrated plate. A construction pouring device for installing a heat preservation integrated plate comprises a frame body, traveling wheels, a vertical support, a transverse support, an adhesive mortar injection device and a balance spring. The driving wheels are arranged at the bottom of the frame body; the vertical bracket is supported on the frame body; the transverse bracket is universally hinged with the vertical bracket; the adhesive mortar injection device is arranged on the frame body, and a conveying pipe of the adhesive mortar injection device is hung at the first end of the transverse support; the balance spring is connected with the second end of the transverse support and the vertical support so that the transverse support can be kept balanced.
本申请实施例是关于一种安装保温一体板的施工灌注设备,涉及建筑技术领域,主要目的在于提高保温一体板的施工效率。安装保温一体板的施工灌注设备,包括架体、行驶轮、竖向支架、横向支架、粘结砂浆注入装置以及平衡弹簧;行驶轮设置于所述架体的底部;竖向支架支撑于所述架体;横向支架与所述竖向支架万向铰接;粘结砂浆注入装置设置于所述架体,所述粘结砂浆注入装置的输料管悬挂于所述横向支架的第一端;平衡弹簧分别连接所述横向支架的第二端以及所述竖向支架,以使所述横向支架保持平衡。
Construction pouring equipment for installing thermal insulation integrated plate
The embodiment of the invention relates to construction pouring equipment for installing a heat preservation integrated plate, relates to the technical field of buildings, and mainly aims to improve the construction efficiency of the heat preservation integrated plate. A construction pouring device for installing a heat preservation integrated plate comprises a frame body, traveling wheels, a vertical support, a transverse support, an adhesive mortar injection device and a balance spring. The driving wheels are arranged at the bottom of the frame body; the vertical bracket is supported on the frame body; the transverse bracket is universally hinged with the vertical bracket; the adhesive mortar injection device is arranged on the frame body, and a conveying pipe of the adhesive mortar injection device is hung at the first end of the transverse support; the balance spring is connected with the second end of the transverse support and the vertical support so that the transverse support can be kept balanced.
本申请实施例是关于一种安装保温一体板的施工灌注设备,涉及建筑技术领域,主要目的在于提高保温一体板的施工效率。安装保温一体板的施工灌注设备,包括架体、行驶轮、竖向支架、横向支架、粘结砂浆注入装置以及平衡弹簧;行驶轮设置于所述架体的底部;竖向支架支撑于所述架体;横向支架与所述竖向支架万向铰接;粘结砂浆注入装置设置于所述架体,所述粘结砂浆注入装置的输料管悬挂于所述横向支架的第一端;平衡弹簧分别连接所述横向支架的第二端以及所述竖向支架,以使所述横向支架保持平衡。
Construction pouring equipment for installing thermal insulation integrated plate
安装保温一体板的施工灌注设备
SHI YONG (author) / AI MINGXING (author) / WU GUANGBIN (author) / CHEN WEIWEI (author) / FENG HUIHUI (author) / LEI QIANG (author) / SUN TONGTONG (author) / PENG LUOWEN (author) / WANG XUE (author) / LIU PEIYU (author)
2024-06-21
Patent
Electronic Resource
Chinese
Lower chord plate pouring equipment for arch plate concrete pouring construction
European Patent Office | 2021
|European Patent Office | 2023
|Thermal insulation integrated double-wall simultaneous pouring device
European Patent Office | 2024
|Lower chord plate pouring equipment for arch slab concrete pouring construction
European Patent Office | 2023
|Cover plate pouring platform, equipment and construction method
European Patent Office | 2022
|