A platform for research: civil engineering, architecture and urbanism
Concrete and steel structure matching construction method for teaching building construction
The invention discloses a concrete and steel structure matching construction method for teaching building construction, which comprises the following steps: S1, steel structure installation: installing each steel structure on a foundation in sequence by matching with hoisting equipment, so that the steel structures can be preliminarily spliced into a preliminary shape of a building; and S2, a pouring mold is prepared, specifically, a pouring mold plate is fixed to the outer side of the steel structure in a surrounding mode through a fixing device, so that the mold plate can define a pouring cavity on the outer side of the steel structure, and concrete for pouring is prepared, and through cooperation of a swing supporting rod and a guide end wheel, the position of an outlet in the end of a pouring main pipe can be adjusted through a mounting side plate; and meanwhile, the end part of the pouring main pipe can be actively driven to swing, so that the pouring main pipe can fully adapt to the complex conditions in the mold cavity in the pouring process, the phenomenon of insufficient pouring caused by the influence of the complex structure of the mold cavity in the concrete pouring process is effectively prevented, and the concrete pouring effect is effectively improved.
本发明公开了一种教学楼建造的混凝土与钢结构搭配建造方法,包括以下步骤,S1、钢结构安装:配合起吊设备将各钢结构依次安装到地基上,使钢结构可初步拼接成建筑的初步形状,S2、浇筑模具准备:通过固定装置将浇筑模板围绕固定到钢结构外侧,使模板可在钢结构外侧围成浇筑腔室,并准备好浇筑用的混凝土,本发明通过摆动支撑杆和引导端轮的配合可通过安装侧板对浇筑主管端部出口的位置进行调节,同时也可主动带动浇筑主管端部进行摆动,进而使浇筑主管在浇筑的过程中可以充分适应模腔内部的复杂情况,有效的防止了混凝土浇筑过程中受模腔复杂结构的影响而出现浇筑不充分的现象,进而有效的提高了混凝土的浇筑的效果。
Concrete and steel structure matching construction method for teaching building construction
The invention discloses a concrete and steel structure matching construction method for teaching building construction, which comprises the following steps: S1, steel structure installation: installing each steel structure on a foundation in sequence by matching with hoisting equipment, so that the steel structures can be preliminarily spliced into a preliminary shape of a building; and S2, a pouring mold is prepared, specifically, a pouring mold plate is fixed to the outer side of the steel structure in a surrounding mode through a fixing device, so that the mold plate can define a pouring cavity on the outer side of the steel structure, and concrete for pouring is prepared, and through cooperation of a swing supporting rod and a guide end wheel, the position of an outlet in the end of a pouring main pipe can be adjusted through a mounting side plate; and meanwhile, the end part of the pouring main pipe can be actively driven to swing, so that the pouring main pipe can fully adapt to the complex conditions in the mold cavity in the pouring process, the phenomenon of insufficient pouring caused by the influence of the complex structure of the mold cavity in the concrete pouring process is effectively prevented, and the concrete pouring effect is effectively improved.
本发明公开了一种教学楼建造的混凝土与钢结构搭配建造方法,包括以下步骤,S1、钢结构安装:配合起吊设备将各钢结构依次安装到地基上,使钢结构可初步拼接成建筑的初步形状,S2、浇筑模具准备:通过固定装置将浇筑模板围绕固定到钢结构外侧,使模板可在钢结构外侧围成浇筑腔室,并准备好浇筑用的混凝土,本发明通过摆动支撑杆和引导端轮的配合可通过安装侧板对浇筑主管端部出口的位置进行调节,同时也可主动带动浇筑主管端部进行摆动,进而使浇筑主管在浇筑的过程中可以充分适应模腔内部的复杂情况,有效的防止了混凝土浇筑过程中受模腔复杂结构的影响而出现浇筑不充分的现象,进而有效的提高了混凝土的浇筑的效果。
Concrete and steel structure matching construction method for teaching building construction
一种教学楼建造的混凝土与钢结构搭配建造方法
NIU ZHIGUO (author) / TANI ATSUSHI (author) / HAN PING (author) / MA BAOQING (author) / CHENG LEI (author) / GAO WEI (author) / GAO YUE (author) / YANG YONG (author) / WANG E (author) / WEI ZHIQIANG (author)
2024-06-28
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Large-span steel-concrete structure building construction method
European Patent Office | 2021
|Concrete building steel plate reinforcing structure and construction method
European Patent Office | 2023
|Lightweight concrete fireproof construction method for building steel structure
European Patent Office | 2022
|Construction method of large-span steel-concrete structure building
European Patent Office | 2023
|Steel-concrete composite beam structure, building and construction method
European Patent Office | 2020
|