A platform for research: civil engineering, architecture and urbanism
Bridge pouring formwork and pouring method thereof
The invention belongs to the technical field of bridge pouring, and particularly relates to a bridge pouring formwork and a pouring method.The bridge pouring formwork comprises a formwork body, a bottom plate is fixedly connected to the formwork body, a bearing box is placed on the bottom plate, a T-shaped frame is connected to the bottom plate, a sliding block is slidably connected to the T-shaped frame, and a scraping part is slidably connected to the sliding block; the bridge pouring formwork further comprises two connecting frames connected to the formwork body, a T-shaped frame is detachably connected between the two connecting frames through bolts, a plurality of insertion openings are formed in the bottom plate, the connecting frames can be inserted into the insertion openings, and the connecting frames are fixed by screwing the bolts into the insertion openings. The method comprises the following steps that firstly, before erection of reinforcing steel bars is completed and bridge pouring is carried out, a plurality of pouring formworks in regular shapes are spliced, on the premise that pouring concrete can be automatically scraped and flattened, scraped redundant concrete can be conveniently collected in a unified mode, and the surrounding environment is protected;
本发明属于桥梁浇筑技术领域,尤其涉及一种桥梁浇筑模板及其浇筑方法,包括模板主体,模板主体上固接有底板,底板上放置有承接盒,底板上连接有T形架,T形架上滑动连接有滑块,滑块上滑动连接有刮拭部,还包括连接在模板主体上的两个连接架,两个连接架之间通过螺栓可拆卸连接有T形架,所述底板上设有多个插接口,连接架可插入插接口内,通过向插接口内拧紧螺栓的方式对连接架进行固定,所述的一种桥梁浇筑模板的浇筑方法,该方法包括以下步骤:步骤一:在完成钢筋的架设并在进行桥梁浇筑前,将多个规则形状浇筑模板进行拼接,在能够自动对浇筑混凝土进行刮拭平整处理的前提下,便于对刮下的多余混凝土进行统一收集,保护周围环境。
Bridge pouring formwork and pouring method thereof
The invention belongs to the technical field of bridge pouring, and particularly relates to a bridge pouring formwork and a pouring method.The bridge pouring formwork comprises a formwork body, a bottom plate is fixedly connected to the formwork body, a bearing box is placed on the bottom plate, a T-shaped frame is connected to the bottom plate, a sliding block is slidably connected to the T-shaped frame, and a scraping part is slidably connected to the sliding block; the bridge pouring formwork further comprises two connecting frames connected to the formwork body, a T-shaped frame is detachably connected between the two connecting frames through bolts, a plurality of insertion openings are formed in the bottom plate, the connecting frames can be inserted into the insertion openings, and the connecting frames are fixed by screwing the bolts into the insertion openings. The method comprises the following steps that firstly, before erection of reinforcing steel bars is completed and bridge pouring is carried out, a plurality of pouring formworks in regular shapes are spliced, on the premise that pouring concrete can be automatically scraped and flattened, scraped redundant concrete can be conveniently collected in a unified mode, and the surrounding environment is protected;
本发明属于桥梁浇筑技术领域,尤其涉及一种桥梁浇筑模板及其浇筑方法,包括模板主体,模板主体上固接有底板,底板上放置有承接盒,底板上连接有T形架,T形架上滑动连接有滑块,滑块上滑动连接有刮拭部,还包括连接在模板主体上的两个连接架,两个连接架之间通过螺栓可拆卸连接有T形架,所述底板上设有多个插接口,连接架可插入插接口内,通过向插接口内拧紧螺栓的方式对连接架进行固定,所述的一种桥梁浇筑模板的浇筑方法,该方法包括以下步骤:步骤一:在完成钢筋的架设并在进行桥梁浇筑前,将多个规则形状浇筑模板进行拼接,在能够自动对浇筑混凝土进行刮拭平整处理的前提下,便于对刮下的多余混凝土进行统一收集,保护周围环境。
Bridge pouring formwork and pouring method thereof
一种桥梁浇筑模板及其浇筑方法
WANG XIANG (author)
2024-07-02
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Formwork for concrete pouring and pouring method thereof
European Patent Office | 2022
|Transformer firewall windowing pouring device, pouring formwork and pouring method
European Patent Office | 2022
|