A platform for research: civil engineering, architecture and urbanism
Steel pull rod connecting joint and mounting method thereof
The invention relates to the field of multi-story and high-rise suspension structure buildings, in particular to a steel pull rod connecting joint and a mounting method thereof. The internal threads of the connecting sleeve are connected with the two steel pull rods, the connecting sleeve only bears tension, force transmission between the connecting sleeve and the steel pull rods is uniform, and the connecting sleeve is not prone to damage. The connecting joint is further provided with the bearing sleeve connected to the outer side of the connecting sleeve in a threaded mode, compared with a traditional connecting joint, threaded connection enables construction operation to be simpler and more convenient when the bearing sleeve adjusts the elevation, stress of the upper pull rod and the lower pull rod is more uniform during adjustment, and the situation that the steel pull rods and the bearing sleeve are damaged due to stress concentration is avoided. And the annular plate is used for increasing the contact area between the connecting joint and the floor steel beam, so that the bearing reliability is higher.
本发明涉及多高层悬挂结构建筑领域,尤其涉及一种钢拉杆连接节点及其安装方法。本申请的连接套管的内螺纹连接两钢拉杆,连接套管仅承拉,其与钢拉杆的力传递均匀、不易损坏。本申请还设有螺纹连接于连接套管外侧的承托套管,相较于传统连接节点,螺纹连接可使本承托套管调节标高时的施工操作更为简便,且调节时上下拉杆的受力更均匀,不会造成应力集中导致钢拉杆、承托套管损伤。环板用于增大连接节点与楼层钢梁的接触面积,使承托的可靠性更强。
Steel pull rod connecting joint and mounting method thereof
The invention relates to the field of multi-story and high-rise suspension structure buildings, in particular to a steel pull rod connecting joint and a mounting method thereof. The internal threads of the connecting sleeve are connected with the two steel pull rods, the connecting sleeve only bears tension, force transmission between the connecting sleeve and the steel pull rods is uniform, and the connecting sleeve is not prone to damage. The connecting joint is further provided with the bearing sleeve connected to the outer side of the connecting sleeve in a threaded mode, compared with a traditional connecting joint, threaded connection enables construction operation to be simpler and more convenient when the bearing sleeve adjusts the elevation, stress of the upper pull rod and the lower pull rod is more uniform during adjustment, and the situation that the steel pull rods and the bearing sleeve are damaged due to stress concentration is avoided. And the annular plate is used for increasing the contact area between the connecting joint and the floor steel beam, so that the bearing reliability is higher.
本发明涉及多高层悬挂结构建筑领域,尤其涉及一种钢拉杆连接节点及其安装方法。本申请的连接套管的内螺纹连接两钢拉杆,连接套管仅承拉,其与钢拉杆的力传递均匀、不易损坏。本申请还设有螺纹连接于连接套管外侧的承托套管,相较于传统连接节点,螺纹连接可使本承托套管调节标高时的施工操作更为简便,且调节时上下拉杆的受力更均匀,不会造成应力集中导致钢拉杆、承托套管损伤。环板用于增大连接节点与楼层钢梁的接触面积,使承托的可靠性更强。
Steel pull rod connecting joint and mounting method thereof
一种钢拉杆连接节点及其安装方法
LOU FENG (author) / ZHANG WEI (author) / CAI JIANLIANG (author) / LIU YUEQIANG (author) / CHEN JIAHUI (author) / LI HUI (author)
2024-07-02
Patent
Electronic Resource
Chinese
Beam column connecting joint and mounting method thereof
European Patent Office | 2023
|Stair guardrail connecting joint and mounting method thereof
European Patent Office | 2024
|Fabricated connecting joint device and mounting method thereof
European Patent Office | 2024
|Steel beam and concrete column connecting joint mounting method
European Patent Office | 2024
|Settlement joint waterproof connecting device and mounting method thereof
European Patent Office | 2023
|