Municipal pipeline prefabricated side ditch paying-off method with efficient construction
The invention discloses a municipal pipeline prefabricated side ditch paying-off method efficient in construction, and belongs to the field of municipal pipeline construction. The municipal pipeline prefabricated side ditch paying-off method comprises the steps that S1, early-stage preparation is conducted, specifically, firstly, a roadbed needs to be checked, a three-dimensional model of a prefabricated side ditch is manufactured, and the size and the position of the side ditch are determined; s2, measuring the center line of the roadbed: placing points on the center line of the roadbed, measuring the center line of the roadbed, and marking the specific position of the center line on the roadbed; s3, determining the position of a side ditch: connecting offset points towards two sides according to a roadbed center line marked by a design drawing to form a side ditch marking line, and indicating the contour of the side ditch; s4, measuring a plane and an elevation point: setting out the plane and the elevation point according to the side ditch path; s5, setting control points: setting the control points at turning points and end points of the side ditch marking lines; and S6, checking: checking the paying-off result of the prefabricated side ditch. The pay-off efficiency and precision are improved, follow-up construction is facilitated, the construction efficiency is improved, reworking and repairing are reduced, and the cost is reduced.
本发明公开了一种施工高效的市政管线预制边沟放线方法,属于市政管线施工领域,包括:S1前期准备:先需要对路基进行检查,制作预制边沟的三维模型,确定边沟尺寸和位置;S2测量路基中线:对路基中线进行放点,测量路基的中线,在路基上标出中线的具体位置;S3确定边沟位置:根据设计图纸标出的路基中线,向两侧偏移点连成边沟标线,指明边沟轮廓;S4测量平面和高程点:按照边沟路经放样平面和高程点;S5设置控制点:在边沟标线的转折点和端点设置控制点;S6校核:对预制边沟的放线结果进行校核。本发明提高放线效率和精准度,方便后续施工,提高施工效率,减少返工和修补,减少成本。
Municipal pipeline prefabricated side ditch paying-off method with efficient construction
The invention discloses a municipal pipeline prefabricated side ditch paying-off method efficient in construction, and belongs to the field of municipal pipeline construction. The municipal pipeline prefabricated side ditch paying-off method comprises the steps that S1, early-stage preparation is conducted, specifically, firstly, a roadbed needs to be checked, a three-dimensional model of a prefabricated side ditch is manufactured, and the size and the position of the side ditch are determined; s2, measuring the center line of the roadbed: placing points on the center line of the roadbed, measuring the center line of the roadbed, and marking the specific position of the center line on the roadbed; s3, determining the position of a side ditch: connecting offset points towards two sides according to a roadbed center line marked by a design drawing to form a side ditch marking line, and indicating the contour of the side ditch; s4, measuring a plane and an elevation point: setting out the plane and the elevation point according to the side ditch path; s5, setting control points: setting the control points at turning points and end points of the side ditch marking lines; and S6, checking: checking the paying-off result of the prefabricated side ditch. The pay-off efficiency and precision are improved, follow-up construction is facilitated, the construction efficiency is improved, reworking and repairing are reduced, and the cost is reduced.
本发明公开了一种施工高效的市政管线预制边沟放线方法,属于市政管线施工领域,包括:S1前期准备:先需要对路基进行检查,制作预制边沟的三维模型,确定边沟尺寸和位置;S2测量路基中线:对路基中线进行放点,测量路基的中线,在路基上标出中线的具体位置;S3确定边沟位置:根据设计图纸标出的路基中线,向两侧偏移点连成边沟标线,指明边沟轮廓;S4测量平面和高程点:按照边沟路经放样平面和高程点;S5设置控制点:在边沟标线的转折点和端点设置控制点;S6校核:对预制边沟的放线结果进行校核。本发明提高放线效率和精准度,方便后续施工,提高施工效率,减少返工和修补,减少成本。
Municipal pipeline prefabricated side ditch paying-off method with efficient construction
一种施工高效的市政管线预制边沟放线方法
CAO JIANFENG (author) / ZHONG QIN (author) / GU YINHUA (author) / XIANG LIN (author) / ZHU CHUNLONG (author)
2024-07-05
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2023
|European Patent Office | 2022
|Soft foundation prefabricated side ditch construction method
European Patent Office | 2024
|Prefabricated water collecting side ditch and construction method
European Patent Office | 2024
|Prefabricated concrete U-shaped side ditch and construction method
European Patent Office | 2020
|