Bridge pier column dismantling equipment and method
The invention provides bridge pier column dismantling equipment and method. The bridge pier column dismantling equipment comprises two pier columns and a bearing platform. A support, a moving mechanism, a cutting mechanism, a tightening mechanism and a pushing-over mechanism are arranged on the bearing platform. The support comprises a bottom frame, two vertical rods, two inclined rods, a middle frame and a top rod, the bottom frame is arranged at the top of the bearing platform, the two vertical rods are fixedly installed at the top of the bottom frame, the two inclined rods are fixedly installed at the top of the bottom frame, one ends of the two inclined rods are fixedly connected with the two vertical rods respectively, and the other ends of the two inclined rods are fixedly connected with the middle frame. The middle frame is fixedly installed on the two vertical rods and the two inclined rods, and the top rod is fixedly installed on the two vertical rods. The bridge pier column dismantling equipment and method have the advantages that installation is convenient, the bridge pier column is rapidly cut through the diamond rope, and the bridge pier column can be pushed to the position.
本发明提供一种桥梁墩柱拆除设备及方法。所述桥梁墩柱拆除设备包括:两个墩柱和承台,所述承台上设置有支架、移动机构、切割机构、绷紧机构和推倒机构;所述支架包括底框、两个立杆、两个斜杆、中框和顶杆,所述底框设置在承台的顶部,两个所述立杆均固定安装在底框的顶部,两个所述斜杆均固定安装在底框的顶部,两个所述斜杆的一端分别与两个立杆固定连接,所述中框固定安装在两个立杆和两个斜杆上,所述顶杆固定安装在两个立杆上。本发明提供的桥梁墩柱拆除设备及方法安装方便,通过金刚石绳快速对桥梁墩柱进行切割,并能够将桥梁墩柱进行推到的优点。
Bridge pier column dismantling equipment and method
The invention provides bridge pier column dismantling equipment and method. The bridge pier column dismantling equipment comprises two pier columns and a bearing platform. A support, a moving mechanism, a cutting mechanism, a tightening mechanism and a pushing-over mechanism are arranged on the bearing platform. The support comprises a bottom frame, two vertical rods, two inclined rods, a middle frame and a top rod, the bottom frame is arranged at the top of the bearing platform, the two vertical rods are fixedly installed at the top of the bottom frame, the two inclined rods are fixedly installed at the top of the bottom frame, one ends of the two inclined rods are fixedly connected with the two vertical rods respectively, and the other ends of the two inclined rods are fixedly connected with the middle frame. The middle frame is fixedly installed on the two vertical rods and the two inclined rods, and the top rod is fixedly installed on the two vertical rods. The bridge pier column dismantling equipment and method have the advantages that installation is convenient, the bridge pier column is rapidly cut through the diamond rope, and the bridge pier column can be pushed to the position.
本发明提供一种桥梁墩柱拆除设备及方法。所述桥梁墩柱拆除设备包括:两个墩柱和承台,所述承台上设置有支架、移动机构、切割机构、绷紧机构和推倒机构;所述支架包括底框、两个立杆、两个斜杆、中框和顶杆,所述底框设置在承台的顶部,两个所述立杆均固定安装在底框的顶部,两个所述斜杆均固定安装在底框的顶部,两个所述斜杆的一端分别与两个立杆固定连接,所述中框固定安装在两个立杆和两个斜杆上,所述顶杆固定安装在两个立杆上。本发明提供的桥梁墩柱拆除设备及方法安装方便,通过金刚石绳快速对桥梁墩柱进行切割,并能够将桥梁墩柱进行推到的优点。
Bridge pier column dismantling equipment and method
一种桥梁墩柱拆除设备及方法
WU JINGJIANG (author) / ZHANG YONG (author) / JUNG WON HOON (author) / WANG JUAN (author) / YE JIABIN (author) / LU SONG (author) / JING YUTING (author) / CHENG SHENGZHAO (author) / YIN HEJUN (author) / GAO XIAOBO (author)
2024-07-05
Patent
Electronic Resource
Chinese
Bridge high pier column climbing frame dismantling method
European Patent Office | 2023
|Bridge pier column construction steel bar dismantling method
European Patent Office | 2022
|Bridge pier column construction steel bar dismantling equipment and construction method thereof
European Patent Office | 2023
|Automatic dismantling equipment for bridge pier formwork
European Patent Office | 2024
|