A platform for research: civil engineering, architecture and urbanism
Piling auxiliary device and piling method
The invention discloses a piling auxiliary device and a piling method.The piling auxiliary device comprises a first mounting base and a second mounting base which are movably connected to a piling barge, a first driving device is arranged between the first mounting base and the piling barge, and a second driving device is arranged between the second mounting base and the piling barge; a first left clamping device and a second left clamping device are arranged on the first mounting seat, a first right clamping device and a second right clamping device are arranged on the second mounting seat, and the first left clamping device and the first right clamping device can be matched with each other to clamp a prefabricated pipe pile; the second left clamping device and the second right clamping device can be matched with each other to clamp the prefabricated pipe pile, a first telescopic mechanism is arranged on the first mounting base and/or the second mounting base, a second telescopic mechanism is arranged on the first mounting base and/or the second mounting base, and the piling method using the piling auxiliary device improves the construction quality, reduces the rework cost and improves the construction efficiency. And a solid foundation is provided for subsequent photovoltaic installation of a project.
本申请公开了一种打桩辅助装置和打桩方法,其中,打桩辅助装置包括活动连接在打桩船上的第一安装座和第二安装座,第一安装座和打桩船之间设有第一驱动装置,第二安装座和打桩船之间设有第二驱动装置,第一安装座上设有第一左夹持装置和第二左夹持装置,第二安装座上设有第一右夹持装置和第二右夹持装置,第一左夹持装置和第一右夹持装置能够相互配合夹持预制管桩,第二左夹持装置和第二右夹持装置能够相互配合夹持预制管桩,第一安装座和/或第二安装座上设有第一伸缩机构,第一安装座和/或第二安装座上设有第二伸缩机构,使用该打桩辅助装置的打桩方法提升了施工质量,减少了返工成本,为工程后续的光伏安装提供了坚实的基础。
Piling auxiliary device and piling method
The invention discloses a piling auxiliary device and a piling method.The piling auxiliary device comprises a first mounting base and a second mounting base which are movably connected to a piling barge, a first driving device is arranged between the first mounting base and the piling barge, and a second driving device is arranged between the second mounting base and the piling barge; a first left clamping device and a second left clamping device are arranged on the first mounting seat, a first right clamping device and a second right clamping device are arranged on the second mounting seat, and the first left clamping device and the first right clamping device can be matched with each other to clamp a prefabricated pipe pile; the second left clamping device and the second right clamping device can be matched with each other to clamp the prefabricated pipe pile, a first telescopic mechanism is arranged on the first mounting base and/or the second mounting base, a second telescopic mechanism is arranged on the first mounting base and/or the second mounting base, and the piling method using the piling auxiliary device improves the construction quality, reduces the rework cost and improves the construction efficiency. And a solid foundation is provided for subsequent photovoltaic installation of a project.
本申请公开了一种打桩辅助装置和打桩方法,其中,打桩辅助装置包括活动连接在打桩船上的第一安装座和第二安装座,第一安装座和打桩船之间设有第一驱动装置,第二安装座和打桩船之间设有第二驱动装置,第一安装座上设有第一左夹持装置和第二左夹持装置,第二安装座上设有第一右夹持装置和第二右夹持装置,第一左夹持装置和第一右夹持装置能够相互配合夹持预制管桩,第二左夹持装置和第二右夹持装置能够相互配合夹持预制管桩,第一安装座和/或第二安装座上设有第一伸缩机构,第一安装座和/或第二安装座上设有第二伸缩机构,使用该打桩辅助装置的打桩方法提升了施工质量,减少了返工成本,为工程后续的光伏安装提供了坚实的基础。
Piling auxiliary device and piling method
一种打桩辅助装置和打桩方法
LI HAIBO (author) / HE YONGGANG (author) / LI XIUFEI (author) / YANG ZHIQIANG (author) / QING TAIGANG (author) / ZHANG QIANZHOU (author) / ZHOU QI (author) / ZHONG XU (author) / LI CHAOYUE (author) / YANG LONG (author)
2024-07-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen