A platform for research: civil engineering, architecture and urbanism
ALC (autoclaved aerated concrete slab) wallboard mounting node and construction method
The invention discloses an ALC (autoclaved aerated concrete) wallboard mounting node and a construction method, and relates to the field of wallboard mounting, the ALC wallboard mounting node comprises a steel beam, a floor slab and an ALC wallboard arranged between the steel beam and the floor slab; the ALC wallboard is arranged on the floor slab, a lower concrete baffle is arranged on the outer edge of the floor slab, the floor slab is connected with the ALC wallboard through a lower flexible joint, and a gap is filled with cement mortar; the steel beam is connected with an upper node of the ALC wallboard, a gap is filled with a flexible filling material, and an upper wallboard baffle is welded to the outer side of the gap; and the upper flexible node and the lower flexible node are connected with the ALC wallboard through the upper connecting screw rod and the lower connecting screw rod. According to the ALC (autoclaved aerated concrete slab) wallboard mounting node and the construction method, the ALC wallboard green and efficient construction technology research is carried out, the mounting node and the construction technology of the ALC wallboard are optimized, the wallboard connecting node is innovated, the mounting procedure and the construction technology are optimized, the safety and the efficiency of ALC partition board construction are improved, and the labor cost is reduced.
本发明公开了一种ALC(蒸压加气混凝土板)墙板安装节点及施工方法,涉及墙板安装领域,包括钢梁、楼板及设于之间的ALC墙板;所述ALC墙板设置在楼板之上,所述楼板外缘设有下部混凝土挡板,且楼板与ALC墙板通过下部柔性节点连接,缝隙采用水泥砂浆填缝;所述钢梁与ALC墙板上节点相连接,缝隙采用柔性填充材料填缝,并在外侧焊接上部墙板挡板;所述上部柔性节点、下部柔性节点通过上连接螺杆与下连接螺杆与ALC墙板连接。该ALC(蒸压加气混凝土板)墙板安装节点及施工方法,通过开展ALC墙板绿色高效施工技术研究,优化ALC墙板的安装节点和施工工艺,创新墙板连接节点,优化安装工序和施工工艺,提高ALC隔板施工的安全性和效率,降低了人工成本。
ALC (autoclaved aerated concrete slab) wallboard mounting node and construction method
The invention discloses an ALC (autoclaved aerated concrete) wallboard mounting node and a construction method, and relates to the field of wallboard mounting, the ALC wallboard mounting node comprises a steel beam, a floor slab and an ALC wallboard arranged between the steel beam and the floor slab; the ALC wallboard is arranged on the floor slab, a lower concrete baffle is arranged on the outer edge of the floor slab, the floor slab is connected with the ALC wallboard through a lower flexible joint, and a gap is filled with cement mortar; the steel beam is connected with an upper node of the ALC wallboard, a gap is filled with a flexible filling material, and an upper wallboard baffle is welded to the outer side of the gap; and the upper flexible node and the lower flexible node are connected with the ALC wallboard through the upper connecting screw rod and the lower connecting screw rod. According to the ALC (autoclaved aerated concrete slab) wallboard mounting node and the construction method, the ALC wallboard green and efficient construction technology research is carried out, the mounting node and the construction technology of the ALC wallboard are optimized, the wallboard connecting node is innovated, the mounting procedure and the construction technology are optimized, the safety and the efficiency of ALC partition board construction are improved, and the labor cost is reduced.
本发明公开了一种ALC(蒸压加气混凝土板)墙板安装节点及施工方法,涉及墙板安装领域,包括钢梁、楼板及设于之间的ALC墙板;所述ALC墙板设置在楼板之上,所述楼板外缘设有下部混凝土挡板,且楼板与ALC墙板通过下部柔性节点连接,缝隙采用水泥砂浆填缝;所述钢梁与ALC墙板上节点相连接,缝隙采用柔性填充材料填缝,并在外侧焊接上部墙板挡板;所述上部柔性节点、下部柔性节点通过上连接螺杆与下连接螺杆与ALC墙板连接。该ALC(蒸压加气混凝土板)墙板安装节点及施工方法,通过开展ALC墙板绿色高效施工技术研究,优化ALC墙板的安装节点和施工工艺,创新墙板连接节点,优化安装工序和施工工艺,提高ALC隔板施工的安全性和效率,降低了人工成本。
ALC (autoclaved aerated concrete slab) wallboard mounting node and construction method
一种ALC(蒸压加气混凝土板)墙板安装节点及施工方法
CHEN ZHAOGUANG (author) / ZHANG YUPING (author) / LI JIANLIANG (author) / ZHENG ZHOU (author) / TIAN HAINING (author) / LIU XIAOHUI (author) / YIN YU (author)
2024-07-09
Patent
Electronic Resource
Chinese
Autoclaved aerated concrete slab production system and autoclaved aerated concrete slab
European Patent Office | 2021
|Cracking-falling-preventing autoclaved aerated concrete wallboard
European Patent Office | 2022
|Autoclaved aerated concrete, autoclaved aerated concrete slab and preparation method thereof
European Patent Office | 2020
|Autoclaved aerated concrete wallboard and production method thereof
European Patent Office | 2021
|