A platform for research: civil engineering, architecture and urbanism
Construction method of prestressing tendon storing and extracting device
The invention discloses a construction method of a prestressing tendon storing and extracting device, and relates to the technical field of building construction. The construction method of the prestressing tendon storage and extraction device comprises the following specific operation steps: S1, preparing related materials including a rectangular frame body, a movable fixing bolt, an extraction protection horn mouth, a supporting cushion square timber, a hanging bar and an outer protection sleeve, hanging bundles of prestressing tendons into the storage and extraction device, and locking the tops of the prestressing tendons by using the movable fixing bolt, and the top and the periphery of the storing and extracting device are covered with a protective outer cover. According to the construction method of the prestressing tendon storage and extraction device, the safety problem that prestressing tendons of an assembly type prestressing bridge pop out to hurt people during bundle storage, extraction and transfer is solved, the problem that the prestressing tendons rust after being stored for a long time is solved, and the problem that the remaining prestressing tendons are integrally hoisted and transferred is solved; and the working efficiency is improved while the construction safety is ensured.
本发明公开了一种预应力束存放抽取装置的施工方法,涉及建筑施工技术领域。该预应力束存放抽取装置的施工方法,具体操作如下:S1、准备相关材料,包括长方形架体、活动固定螺栓、抽取防护喇叭口、支垫方木、吊筋、外防护套,将成捆预应力束吊放入存放抽取装置内,在预应力束顶部用活动的固定螺栓锁定,从抽取防护喇叭口进行抽拉取出预应力束,存放抽取装置顶部和四周用防护外罩覆盖。该预应力束存放抽取装置的施工方法,解决了装配式预应力桥梁预应力束成捆存放、抽取和转移时弹出伤人的安全问题,解决了预应力束存放日久生锈的问题,解决了剩余预应力束整体吊运转移的问题,保证施工安全的同时提高了工作效率。
Construction method of prestressing tendon storing and extracting device
The invention discloses a construction method of a prestressing tendon storing and extracting device, and relates to the technical field of building construction. The construction method of the prestressing tendon storage and extraction device comprises the following specific operation steps: S1, preparing related materials including a rectangular frame body, a movable fixing bolt, an extraction protection horn mouth, a supporting cushion square timber, a hanging bar and an outer protection sleeve, hanging bundles of prestressing tendons into the storage and extraction device, and locking the tops of the prestressing tendons by using the movable fixing bolt, and the top and the periphery of the storing and extracting device are covered with a protective outer cover. According to the construction method of the prestressing tendon storage and extraction device, the safety problem that prestressing tendons of an assembly type prestressing bridge pop out to hurt people during bundle storage, extraction and transfer is solved, the problem that the prestressing tendons rust after being stored for a long time is solved, and the problem that the remaining prestressing tendons are integrally hoisted and transferred is solved; and the working efficiency is improved while the construction safety is ensured.
本发明公开了一种预应力束存放抽取装置的施工方法,涉及建筑施工技术领域。该预应力束存放抽取装置的施工方法,具体操作如下:S1、准备相关材料,包括长方形架体、活动固定螺栓、抽取防护喇叭口、支垫方木、吊筋、外防护套,将成捆预应力束吊放入存放抽取装置内,在预应力束顶部用活动的固定螺栓锁定,从抽取防护喇叭口进行抽拉取出预应力束,存放抽取装置顶部和四周用防护外罩覆盖。该预应力束存放抽取装置的施工方法,解决了装配式预应力桥梁预应力束成捆存放、抽取和转移时弹出伤人的安全问题,解决了预应力束存放日久生锈的问题,解决了剩余预应力束整体吊运转移的问题,保证施工安全的同时提高了工作效率。
Construction method of prestressing tendon storing and extracting device
一种预应力束存放抽取装置的施工方法
XIAO LAIBING (author) / XIAN TONGCHAO (author) / CHEN YUHUA (author)
2024-07-12
Patent
Electronic Resource
Chinese
SUPER-LONG PRESTRESSING STEEL TENDON CONSTRUCTION METHOD
European Patent Office | 2023
|Construction method of prestressed beam prestressing tendon tensioning operation platform
European Patent Office | 2024
|Optimization of Prestressing Tendon Profile
British Library Conference Proceedings | 1999
|PRESTRESSING METHOD FOR TENDON AND CONSTRUCTION METHOD FOR GIRDER USING THE SAME
European Patent Office | 2015
|