A platform for research: civil engineering, architecture and urbanism
Steel structure combined embedded part and construction method thereof
The invention discloses a steel structure combined embedded part and a construction method thereof. The steel structure combined embedded part comprises a first formwork, a plurality of second formworks and an embedded column, and the first formwork and the second formworks form a closed frame; the pre-embedded column further comprises a pre-embedded plate, a plurality of pre-embedded screws are arranged on the pre-embedded plate in a sliding mode, a fixing plate is fixedly connected to the bottom of the pre-embedded plate, and the pre-embedded column is matched with the pre-embedded screws. According to the steel structure combined embedded part and the construction method thereof, the first formwork and the multiple second formworks are fixed to form a specified shape, then concrete is poured into the spliced specified shape, and the embedded plate drives the embedded screw to be placed at any position in the concrete; and then the embedded plate is pushed to the center positions of the first formwork and the multiple second formworks through the positioning locking pieces and locked, and when concrete is vibrated, the stability of the embedded part is guaranteed, so that anchoring of the embedded part is guaranteed, operation steps are saved, and use is convenient.
本发明公开了一种钢结构组合预埋件及其施工方法,包括第一模板、多个第二模板与预埋柱,所述第一模板与多个所述第二模板组成呈封闭框;还包括预埋板,所述预埋板上滑动设置有多个预埋螺杆,并且预埋板的底部固定连接有固定板,所述预埋柱与各所述预埋螺杆相适配。本发明提供的一种钢结构组合预埋件及其施工方法通过第一模板与多个第二模板固定组成呈指定形状,然后对拼合后的指定形状内浇筑混凝土,将预埋板带动预埋螺杆放置于混凝土中任意位置,然后通过定位锁止件将预埋板推动至第一模板与多个第二模板的中心位置并锁定,在对混凝土进行振捣时,保证预埋件的稳定性,从而保证对预埋件的锚固,节省操作步骤,方便使用。
Steel structure combined embedded part and construction method thereof
The invention discloses a steel structure combined embedded part and a construction method thereof. The steel structure combined embedded part comprises a first formwork, a plurality of second formworks and an embedded column, and the first formwork and the second formworks form a closed frame; the pre-embedded column further comprises a pre-embedded plate, a plurality of pre-embedded screws are arranged on the pre-embedded plate in a sliding mode, a fixing plate is fixedly connected to the bottom of the pre-embedded plate, and the pre-embedded column is matched with the pre-embedded screws. According to the steel structure combined embedded part and the construction method thereof, the first formwork and the multiple second formworks are fixed to form a specified shape, then concrete is poured into the spliced specified shape, and the embedded plate drives the embedded screw to be placed at any position in the concrete; and then the embedded plate is pushed to the center positions of the first formwork and the multiple second formworks through the positioning locking pieces and locked, and when concrete is vibrated, the stability of the embedded part is guaranteed, so that anchoring of the embedded part is guaranteed, operation steps are saved, and use is convenient.
本发明公开了一种钢结构组合预埋件及其施工方法,包括第一模板、多个第二模板与预埋柱,所述第一模板与多个所述第二模板组成呈封闭框;还包括预埋板,所述预埋板上滑动设置有多个预埋螺杆,并且预埋板的底部固定连接有固定板,所述预埋柱与各所述预埋螺杆相适配。本发明提供的一种钢结构组合预埋件及其施工方法通过第一模板与多个第二模板固定组成呈指定形状,然后对拼合后的指定形状内浇筑混凝土,将预埋板带动预埋螺杆放置于混凝土中任意位置,然后通过定位锁止件将预埋板推动至第一模板与多个第二模板的中心位置并锁定,在对混凝土进行振捣时,保证预埋件的稳定性,从而保证对预埋件的锚固,节省操作步骤,方便使用。
Steel structure combined embedded part and construction method thereof
一种钢结构组合预埋件及其施工方法
ZHOU YANHUA (author) / WANG XINLI (author) / YA HUALI (author)
2024-07-16
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Combined embedded steel bar embedded part and using method thereof
European Patent Office | 2023
|Combined clamping plate embedded part and embedded part construction method
European Patent Office | 2021
|Steel car bumper embedded part and construction method thereof
European Patent Office | 2020
|