A platform for research: civil engineering, architecture and urbanism
Embedded part structure and construction method thereof
The invention provides an embedded part structure and a construction method thereof, and belongs to the technical field of building embedded parts. The embedded part structure comprises anchor bars, enclosure parts, anchor plates, hanging rods and horizontal adjusting devices; the anchor bar penetrates through the interior of the anchor plate, the enclosure part is connected with the middle of the anchor bar, it is guaranteed that the anchor bar is in a vertical state, the hanging rod abuts against the lower portion of the anchor bar, the two ends of the hanging rod are connected with main bars of a concrete structure, and movement of the anchor bar in the axis direction is limited. The anchor plate and the anchor bars are designed to be of a detachable structure, the anchor plate is removed when concrete is poured, the concrete vibration condition can be clearly observed, the technical problem that vibration leakage or excessive vibration easily occurs below the large-area anchor plate is solved, the beneficial effects of sufficient tamping and no looseness are achieved, and air in the concrete is smoothly exhausted; the horizontal adjusting device is arranged to be connected with the building formwork, when the embedded part deviates, the position of the embedded part can be finely adjusted, and the engineering quality is improved.
本发明提供了一种预埋件结构及其施工方法,属于建筑预埋件技术领域,包括锚筋、围护件、锚板、挂杆和水平调整装置;锚筋从锚板内部穿过,围护件与锚筋的中部连接,保证锚筋处于竖直状态,挂杆与锚筋的下部相抵,挂杆的两端与混凝土结构的主筋连接,限制了锚筋沿其轴线方向的移动。通过将锚板和锚筋设计成可拆卸的结构,在浇筑混凝土时移除锚板,能够清楚的观察到混凝土振捣的情况,解决了大面积锚板下方容易出现漏振或过度振捣的技术问题,取得充分捣实和无松散的有益效果,还使混凝土中的空气顺利排出;通过设置水平调整装置与建筑模板连接,在预埋件发生偏移时,能够微调预埋件的位置,提高了工程质量。
Embedded part structure and construction method thereof
The invention provides an embedded part structure and a construction method thereof, and belongs to the technical field of building embedded parts. The embedded part structure comprises anchor bars, enclosure parts, anchor plates, hanging rods and horizontal adjusting devices; the anchor bar penetrates through the interior of the anchor plate, the enclosure part is connected with the middle of the anchor bar, it is guaranteed that the anchor bar is in a vertical state, the hanging rod abuts against the lower portion of the anchor bar, the two ends of the hanging rod are connected with main bars of a concrete structure, and movement of the anchor bar in the axis direction is limited. The anchor plate and the anchor bars are designed to be of a detachable structure, the anchor plate is removed when concrete is poured, the concrete vibration condition can be clearly observed, the technical problem that vibration leakage or excessive vibration easily occurs below the large-area anchor plate is solved, the beneficial effects of sufficient tamping and no looseness are achieved, and air in the concrete is smoothly exhausted; the horizontal adjusting device is arranged to be connected with the building formwork, when the embedded part deviates, the position of the embedded part can be finely adjusted, and the engineering quality is improved.
本发明提供了一种预埋件结构及其施工方法,属于建筑预埋件技术领域,包括锚筋、围护件、锚板、挂杆和水平调整装置;锚筋从锚板内部穿过,围护件与锚筋的中部连接,保证锚筋处于竖直状态,挂杆与锚筋的下部相抵,挂杆的两端与混凝土结构的主筋连接,限制了锚筋沿其轴线方向的移动。通过将锚板和锚筋设计成可拆卸的结构,在浇筑混凝土时移除锚板,能够清楚的观察到混凝土振捣的情况,解决了大面积锚板下方容易出现漏振或过度振捣的技术问题,取得充分捣实和无松散的有益效果,还使混凝土中的空气顺利排出;通过设置水平调整装置与建筑模板连接,在预埋件发生偏移时,能够微调预埋件的位置,提高了工程质量。
Embedded part structure and construction method thereof
一种预埋件结构及其施工方法
XIAO QIZHONG (author) / YE ZHENQIU (author) / GAO MIN (author)
2023-07-04
Patent
Electronic Resource
Chinese
Wall embedded part waterproof structure and construction method thereof
European Patent Office | 2023
|Steel structure combined embedded part and construction method thereof
European Patent Office | 2024
|European Patent Office | 2024
|Balcony railing embedded part and embedded construction process thereof
European Patent Office | 2020
|