A platform for research: civil engineering, architecture and urbanism
Steel structure roof and installation method thereof
The invention belongs to the field of steel structure buildings, and particularly relates to a steel structure roof and an installation method thereof.The steel structure roof comprises a set of triangular supports connected with a wall supporting frame and a set of purlines arranged between every two adjacent triangular supports, connecting ribs are fixedly connected between the purlines in advance, and the purlines are arranged side by side at intervals through the connecting ribs; the connecting ribs are arranged so that a crane can conveniently lift the multiple purlines at the same time, the purlines are positioned by means of fixed connection with the connecting ribs, the multiple purlines are laid on the triangular support at the same time by means of the connecting ribs in the purline installation process, and after laying, the positions of the multiple purlines can be adjusted at the same time or a single purline can be finely adjusted. And the purline is not supported by a worker in the process of fixing the purline and the triangular bracket due to the pulling effect of the connecting ribs on the purline, so that the physical labor is reduced, the purline can be quickly fixed, and the working efficiency is improved.
本发明属于钢结构建筑领域,具体涉及一种钢结构屋顶及其安装方法,其中钢结构屋顶包括一组与墙体支撑架连接的三角支架和一组设置于相邻两三角支架之间的檩条,所述的檩条之间预设固连有连接筋,檩条借助连接筋间隔并列设置,连接筋的设置便于吊车同时将多个檩条吊起,檩条之间借助与连接筋的固连形成定位,檩条安装过程中借助连接筋使多根檩条同时铺设在三角支架上,铺设后可对多根檩条的位置同时调整或对单根檩条进行微调即可,并且连接筋对檩条的拉拽作用省去了工作人员在对檩条与三角支架固定过程中对檩条的承托,减轻体力劳动,有助于实现对檩条的快速固定,工作效率得以提高。
Steel structure roof and installation method thereof
The invention belongs to the field of steel structure buildings, and particularly relates to a steel structure roof and an installation method thereof.The steel structure roof comprises a set of triangular supports connected with a wall supporting frame and a set of purlines arranged between every two adjacent triangular supports, connecting ribs are fixedly connected between the purlines in advance, and the purlines are arranged side by side at intervals through the connecting ribs; the connecting ribs are arranged so that a crane can conveniently lift the multiple purlines at the same time, the purlines are positioned by means of fixed connection with the connecting ribs, the multiple purlines are laid on the triangular support at the same time by means of the connecting ribs in the purline installation process, and after laying, the positions of the multiple purlines can be adjusted at the same time or a single purline can be finely adjusted. And the purline is not supported by a worker in the process of fixing the purline and the triangular bracket due to the pulling effect of the connecting ribs on the purline, so that the physical labor is reduced, the purline can be quickly fixed, and the working efficiency is improved.
本发明属于钢结构建筑领域,具体涉及一种钢结构屋顶及其安装方法,其中钢结构屋顶包括一组与墙体支撑架连接的三角支架和一组设置于相邻两三角支架之间的檩条,所述的檩条之间预设固连有连接筋,檩条借助连接筋间隔并列设置,连接筋的设置便于吊车同时将多个檩条吊起,檩条之间借助与连接筋的固连形成定位,檩条安装过程中借助连接筋使多根檩条同时铺设在三角支架上,铺设后可对多根檩条的位置同时调整或对单根檩条进行微调即可,并且连接筋对檩条的拉拽作用省去了工作人员在对檩条与三角支架固定过程中对檩条的承托,减轻体力劳动,有助于实现对檩条的快速固定,工作效率得以提高。
Steel structure roof and installation method thereof
钢结构屋顶及其安装方法
GUO XIAOBO (author) / ZHANG TAO (author) / QIAO YONGMIN (author) / XIAO YANLONG (author) / ZHAO JIANGBO (author) / FENG BOYU (author) / YANG KUN (author)
2024-07-23
Patent
Electronic Resource
Chinese
Fabricated steel structure building roof and hoisting installation method thereof
European Patent Office | 2021
|Steel structure factory building roof structure installation method
European Patent Office | 2021
|