Templated template trepanning method
A templated formwork trepanning method is characterized by comprising the following steps that a, according to the positions of embedded bolts in a construction drawing, formwork modeling design at the positions of concrete walls, columns and beams with the embedded bolts is equally and evenly divided, b, a plurality of formworks to be trepanned are sequentially stacked on the flat ground, a standard-size formwork is placed above the formworks to be trepanned, and the formwork to be trepanned is formed. C, adjusting the template with the standard size to a suitable size by adjusting the transverse adjusting ruler (2) and the longitudinal adjusting ruler (4) respectively; and d, inspecting the hole opening quality, and moving away the template with the standard size. The template trepanning method has the advantages that the trepanning precision of the template is ensured, the modularized trepanning fixing component can be recycled for multiple times, the use of labor force is reduced during construction, the trepanning time of the template is greatly shortened, the construction efficiency is improved by more than 70%, and the cost is reduced.
一种模板化模板开孔方法,其特征在于包括以下步骤:a、根据施工图纸预埋螺栓位置,将有预埋螺栓的混凝土墙、柱、梁处的模板建模设计等分均匀,b、将多块待开孔模板依次叠放在平坦地面,并在待开孔模板上方放置标准尺寸模板,c、将标准尺寸模板分别通过调节横向调节尺(2)和纵向调节尺(4)调至适用尺寸,d、检验开孔质量,挪开标准尺寸模板。本发明的模板化模板开孔方法具有确保模板开孔精度,模块化开孔固定构件还能够多次循环使用,施工时减少了劳动力使用,极大的缩短模板开孔时间,施工效率提高70%以上和降低成本的优点。
Templated template trepanning method
A templated formwork trepanning method is characterized by comprising the following steps that a, according to the positions of embedded bolts in a construction drawing, formwork modeling design at the positions of concrete walls, columns and beams with the embedded bolts is equally and evenly divided, b, a plurality of formworks to be trepanned are sequentially stacked on the flat ground, a standard-size formwork is placed above the formworks to be trepanned, and the formwork to be trepanned is formed. C, adjusting the template with the standard size to a suitable size by adjusting the transverse adjusting ruler (2) and the longitudinal adjusting ruler (4) respectively; and d, inspecting the hole opening quality, and moving away the template with the standard size. The template trepanning method has the advantages that the trepanning precision of the template is ensured, the modularized trepanning fixing component can be recycled for multiple times, the use of labor force is reduced during construction, the trepanning time of the template is greatly shortened, the construction efficiency is improved by more than 70%, and the cost is reduced.
一种模板化模板开孔方法,其特征在于包括以下步骤:a、根据施工图纸预埋螺栓位置,将有预埋螺栓的混凝土墙、柱、梁处的模板建模设计等分均匀,b、将多块待开孔模板依次叠放在平坦地面,并在待开孔模板上方放置标准尺寸模板,c、将标准尺寸模板分别通过调节横向调节尺(2)和纵向调节尺(4)调至适用尺寸,d、检验开孔质量,挪开标准尺寸模板。本发明的模板化模板开孔方法具有确保模板开孔精度,模块化开孔固定构件还能够多次循环使用,施工时减少了劳动力使用,极大的缩短模板开孔时间,施工效率提高70%以上和降低成本的优点。
Templated template trepanning method
一种模板化模板开孔方法
XIA SHIJIE (author) / LIU PU (author) / YANG DONGDONG (author) / WU ZONGXIN (author)
2024-07-30
Patent
Electronic Resource
Chinese