A platform for research: civil engineering, architecture and urbanism
Hoisting-platform-free steel-concrete composite beam multidirectional transporting and erecting integrated construction device and method
The invention discloses a hoisting-platform-free steel-concrete composite beam multidirectional transporting and erecting integrated construction device and method, and the device comprises rails which are provided with two groups of transverse and longitudinal directions; the walking track frame is arranged on the track in a sliding mode, and the walking track frame can be erected on the transverse track or the longitudinal track to move in different directions; the invention relates to the technical field of bridge engineering. According to the hoisting-platform-free steel-concrete composite beam multi-direction transporting and erecting integrated construction device and method, transverse and longitudinal two-way I-shaped steel rails are installed in a steel-concrete composite beam bridge deck slab installation area, then a bottom automatic walking device is installed, the device can enable a crane to move along the rails in a working area, the bridge deck slab can be moved to a designated position to be hoisted, and the construction efficiency is improved. The periphery of the device has cantilever conditions, multi-span rapid hoisting of the bridge deck slab is achieved, the walking track frame can be switched to I-shaped steel tracks in the transverse direction and the longitudinal direction, then the bridge deck slab can be hoisted and installed in the transverse direction and the longitudinal direction, and the construction range is larger.
本发明公开了无吊装平台的钢混组合梁多向运架一体化施工装置及方法,包括:轨道,设置有横向、纵向的两组方向;行走轨道架,所述行走轨道架滑动设置于轨道上,所述行走轨道架可架设于横向或纵向的轨道上进行不同方向移动;本发明涉及桥梁工程技术领域。该无吊装平台的钢混组合梁多向运架一体化施工装置及方法,在钢混组合梁桥面板安装区域的横、纵双向的工字钢轨道,然后安装底部自动行走装置,该装置可以使吊机在工作区域内沿轨道移动,可将桥面板移动到指定位置进行吊装,该装置四周均具备悬臂条件,实现桥面板的多跨快速吊装,行走轨道架还可切换至横、纵不同方向的工字钢轨道上,进而可以进行桥面板的横、纵向吊装和安装,施工范围更大。
Hoisting-platform-free steel-concrete composite beam multidirectional transporting and erecting integrated construction device and method
The invention discloses a hoisting-platform-free steel-concrete composite beam multidirectional transporting and erecting integrated construction device and method, and the device comprises rails which are provided with two groups of transverse and longitudinal directions; the walking track frame is arranged on the track in a sliding mode, and the walking track frame can be erected on the transverse track or the longitudinal track to move in different directions; the invention relates to the technical field of bridge engineering. According to the hoisting-platform-free steel-concrete composite beam multi-direction transporting and erecting integrated construction device and method, transverse and longitudinal two-way I-shaped steel rails are installed in a steel-concrete composite beam bridge deck slab installation area, then a bottom automatic walking device is installed, the device can enable a crane to move along the rails in a working area, the bridge deck slab can be moved to a designated position to be hoisted, and the construction efficiency is improved. The periphery of the device has cantilever conditions, multi-span rapid hoisting of the bridge deck slab is achieved, the walking track frame can be switched to I-shaped steel tracks in the transverse direction and the longitudinal direction, then the bridge deck slab can be hoisted and installed in the transverse direction and the longitudinal direction, and the construction range is larger.
本发明公开了无吊装平台的钢混组合梁多向运架一体化施工装置及方法,包括:轨道,设置有横向、纵向的两组方向;行走轨道架,所述行走轨道架滑动设置于轨道上,所述行走轨道架可架设于横向或纵向的轨道上进行不同方向移动;本发明涉及桥梁工程技术领域。该无吊装平台的钢混组合梁多向运架一体化施工装置及方法,在钢混组合梁桥面板安装区域的横、纵双向的工字钢轨道,然后安装底部自动行走装置,该装置可以使吊机在工作区域内沿轨道移动,可将桥面板移动到指定位置进行吊装,该装置四周均具备悬臂条件,实现桥面板的多跨快速吊装,行走轨道架还可切换至横、纵不同方向的工字钢轨道上,进而可以进行桥面板的横、纵向吊装和安装,施工范围更大。
Hoisting-platform-free steel-concrete composite beam multidirectional transporting and erecting integrated construction device and method
无吊装平台的钢混组合梁多向运架一体化施工装置及方法
LUO SHENGHONG (author) / FAN LILONG (author) / WANG SONG (author) / LIU ZHI (author) / JIA GUANG (author) / FU JUN'EN (author) / ZHANG KAI (author) / PENG ZHICHUAN (author) / GONG WENLIN (author) / WU XIAOYU (author)
2024-08-02
Patent
Electronic Resource
Chinese
Bridge composite beam erecting and hoisting construction method
European Patent Office | 2022
|European Patent Office | 2022
|Assembly type bridge integrated transporting and erecting construction method
European Patent Office | 2023
|Construction method for modular hoisting of steel-concrete composite beam
European Patent Office | 2023
|Construction method for erecting steel-concrete composite beam by using jacking equipment
European Patent Office | 2022
|