Bridge composite beam erecting and hoisting construction method
The invention provides a hoisting construction method for erecting a bridge composite beam, and belongs to the field of machinery. The method comprises the following steps: 1, preparing a site, splicing a bridge girder erection machine at a bridgehead roadbed, flattening and compacting the roadbed, and meeting the mounting load standard of the bridge girder erection machine; the bridge roadbed is generally composed of a roadbed, a road surface, a bridge, tunnel engineering, traffic engineering facilities and the like, and the construction method has the beneficial effects that the strength of the roadbed is guaranteed by adopting the strong cement reinforced concrete aggregates, so that in the process of erecting the bridge, when the bridge is erected subsequently, the construction period is shortened, and the construction efficiency is improved. The pavement structure can be further erected and supported conveniently, and a bridge roadbed treatment mode is adopted, so that the pavement of the lower bridge foundation support aspect structure is ensured.
本发明提供一种桥梁组合梁架设吊装施工方法,属于机械领域,对桥梁支撑基座的构建放置;第一步:场地准备,架桥机需要在桥头路基的拼接组成,路基需要平整密实,满足架桥机的安装荷载标准;第二步:路基的压实处理,首先桥梁路基一般是由路基、路面、桥梁、隧道工程和交通工程设施等几大部分组成,本发明的有益效果是:采用的强力的水泥钢筋混凝土粒料保证了路基强度,方便在架设桥梁的过程中,后续在架设桥梁时,方便将路面结构做进一步的架设支撑,采用的桥梁路基的处理方式,保证了下方桥基支撑方面结构的铺设。
Bridge composite beam erecting and hoisting construction method
The invention provides a hoisting construction method for erecting a bridge composite beam, and belongs to the field of machinery. The method comprises the following steps: 1, preparing a site, splicing a bridge girder erection machine at a bridgehead roadbed, flattening and compacting the roadbed, and meeting the mounting load standard of the bridge girder erection machine; the bridge roadbed is generally composed of a roadbed, a road surface, a bridge, tunnel engineering, traffic engineering facilities and the like, and the construction method has the beneficial effects that the strength of the roadbed is guaranteed by adopting the strong cement reinforced concrete aggregates, so that in the process of erecting the bridge, when the bridge is erected subsequently, the construction period is shortened, and the construction efficiency is improved. The pavement structure can be further erected and supported conveniently, and a bridge roadbed treatment mode is adopted, so that the pavement of the lower bridge foundation support aspect structure is ensured.
本发明提供一种桥梁组合梁架设吊装施工方法,属于机械领域,对桥梁支撑基座的构建放置;第一步:场地准备,架桥机需要在桥头路基的拼接组成,路基需要平整密实,满足架桥机的安装荷载标准;第二步:路基的压实处理,首先桥梁路基一般是由路基、路面、桥梁、隧道工程和交通工程设施等几大部分组成,本发明的有益效果是:采用的强力的水泥钢筋混凝土粒料保证了路基强度,方便在架设桥梁的过程中,后续在架设桥梁时,方便将路面结构做进一步的架设支撑,采用的桥梁路基的处理方式,保证了下方桥基支撑方面结构的铺设。
Bridge composite beam erecting and hoisting construction method
一种桥梁组合梁架设吊装施工方法
YE JINGLIANG (author) / GAO MIAO (author) / WU PIN (author)
2022-04-12
Patent
Electronic Resource
Chinese
Multifunctional bridge erecting machine and bridge erecting construction method
European Patent Office | 2022
|European Patent Office | 2024
|European Patent Office | 2022
|Bridge erecting machine and method for full-prefabricated bridge erecting construction
European Patent Office | 2020
|Bridge erecting machine for road and bridge erecting construction
European Patent Office | 2024
|