Anchoring pile construction method
The invention provides an anchor pile construction method which comprises the following steps: S1, determining the positions and the number of anchor piles, and selecting proper anchor pile models and materials according to design requirements; s2, pretreatment work is conducted on a construction site; s3, geological survey and equipment detection; s4, according to design requirements, a drilling mechanism is installed at the position to be subjected to hole digging, and a hole is dug in the position of the anchoring pile; s5, a mortar or broken stone hardcore is laid at the bottom of the hole; s6, a positioning steel pipe is vertically fixed to the bottom of the hole, then the reinforcement cage is placed into the hole according to the design requirement, the positioning steel pipe is made to be tightly attached to the inner wall of the reinforcement cage, the perpendicularity and the alignment degree of the reinforcement cage at the moment are ensured, and then pouring is conducted to form an anchoring pile; s7, the periphery of the anchoring pile is filled with compact slurry, gravel or concrete; s8, a bearing component is mounted at the top of the anchoring pile; s9, monitoring and testing are carried out; and S10, after construction is finished, ending work is carried out, and site cleaning and material arrangement are carried out. The method can improve the construction precision and efficiency and reduce the construction risk.
本发明提供一种锚固桩施工方法,包括以下步骤:S1、确定锚固桩的位置和数量,并根据设计要求选择适合的锚固桩型号和材料;S2、在施工现场进行预处理工作;S3、地质勘测与设备检测;S4、根据设计要求,在待挖孔位置安装钻孔机构,在锚固桩位置上开挖孔;S5、在孔底部铺垫一层砂浆或碎石垫层;S6、在孔底部竖直固定定位钢管,然后将钢筋笼根据设计要求放入孔内,使得定位钢管紧贴钢筋笼的内壁,确保钢筋笼此时的垂直度和对齐度,然后进行浇筑形成锚固桩;S7、在锚固桩周围填充紧实的泥浆、碎石或混凝土;S8、在锚固桩顶部安装承载部件;S9、进行监测和测试;S10、施工结束后进行收尾工作,包括清理现场、整理材料。该方法能够提高施工精度和效率,降低施工风险。
Anchoring pile construction method
The invention provides an anchor pile construction method which comprises the following steps: S1, determining the positions and the number of anchor piles, and selecting proper anchor pile models and materials according to design requirements; s2, pretreatment work is conducted on a construction site; s3, geological survey and equipment detection; s4, according to design requirements, a drilling mechanism is installed at the position to be subjected to hole digging, and a hole is dug in the position of the anchoring pile; s5, a mortar or broken stone hardcore is laid at the bottom of the hole; s6, a positioning steel pipe is vertically fixed to the bottom of the hole, then the reinforcement cage is placed into the hole according to the design requirement, the positioning steel pipe is made to be tightly attached to the inner wall of the reinforcement cage, the perpendicularity and the alignment degree of the reinforcement cage at the moment are ensured, and then pouring is conducted to form an anchoring pile; s7, the periphery of the anchoring pile is filled with compact slurry, gravel or concrete; s8, a bearing component is mounted at the top of the anchoring pile; s9, monitoring and testing are carried out; and S10, after construction is finished, ending work is carried out, and site cleaning and material arrangement are carried out. The method can improve the construction precision and efficiency and reduce the construction risk.
本发明提供一种锚固桩施工方法,包括以下步骤:S1、确定锚固桩的位置和数量,并根据设计要求选择适合的锚固桩型号和材料;S2、在施工现场进行预处理工作;S3、地质勘测与设备检测;S4、根据设计要求,在待挖孔位置安装钻孔机构,在锚固桩位置上开挖孔;S5、在孔底部铺垫一层砂浆或碎石垫层;S6、在孔底部竖直固定定位钢管,然后将钢筋笼根据设计要求放入孔内,使得定位钢管紧贴钢筋笼的内壁,确保钢筋笼此时的垂直度和对齐度,然后进行浇筑形成锚固桩;S7、在锚固桩周围填充紧实的泥浆、碎石或混凝土;S8、在锚固桩顶部安装承载部件;S9、进行监测和测试;S10、施工结束后进行收尾工作,包括清理现场、整理材料。该方法能够提高施工精度和效率,降低施工风险。
Anchoring pile construction method
一种锚固桩施工方法
WU XIAOYONG (author) / CHEN SHAOJIE (author) / QI DONGCHUN (author) / YUAN XIAOXIA (author) / YANG JIAN (author) / PANG HAITAO (author) / YANG YIGANG (author) / XU YIFAN (author) / YANG ZHIPENG (author)
2024-08-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Anchoring pile construction device and anchoring pile construction method
European Patent Office | 2024
|Anchoring precast pile for underground engineering and construction method
European Patent Office | 2023
|Support pile shotcreting and anchoring structure and construction method
European Patent Office | 2023
|Umbrella stand type uplift anchoring pile and construction method
European Patent Office | 2022
|