A platform for research: civil engineering, architecture and urbanism
Concrete intercepting method and assembly type concrete intercepting construction assembly
The invention discloses a concrete interception method and an assembly type concrete interception construction assembly. The concrete interception method comprises the following specific operation method steps that S1, assembly body blocking plates, bottom opening round head cones and horizontal fixing steel plates of different specifications are selected and moved to a construction site; s2, after beam steel bars are bound and cleaned, stirrups are selected at the designated positions of column joints, horizontal fixing steel plates are placed, assembly body blocking steel plates penetrate through the steel bar intervals to be sequentially installed, and the assembly body blocking steel plates are connected into a whole through rabbets and tongues; s3, horizontal fixing steel plates are placed as bases and used for containing clamping groove fixing steel plates, and the assembly fixing steel plates at the ends are fixed through fixing steel plate clamping grooves; s4, a structural body is installed on the end assembly body blocking steel plate; s5, concrete is poured in a layered mode; and S6, after concrete is poured and formed, the barrier steel plates are sequentially dismantled. The bottom opening sealing structure can achieve the effect of enhancing the overall concrete impact resistance, has better stability and can solve the problem that the bottom opening sealing effect is poor.
本发明公开了一种混凝土拦截方法及装配式混凝土拦截施工组件,包括以下具体操作方法步骤:S1.选用不同规格的装配体阻隔板、底口圆头锥体、水平固定钢板,并移动至施工现场;S2.梁钢筋绑扎清理完成后选择柱节点指定位置箍筋,放置水平固定钢板,将装配体阻隔钢板穿过钢筋间距依次安装,装配体阻隔钢板通过企口连接形成整体;S3.放置水平固定钢板作为底座,用于放置卡槽固定钢板,端部的装配体固定钢板通过固定钢板卡槽固定;S4.在端部装配体阻隔钢板上安装结构体;S5.混凝土分层浇筑;S6.混凝土浇筑成型后依次拆除阻隔钢板。本发明能够起到加强整体抵抗混凝土冲击的作用,具有更好稳固性的同时能够解决底口封堵效果差的问题。
Concrete intercepting method and assembly type concrete intercepting construction assembly
The invention discloses a concrete interception method and an assembly type concrete interception construction assembly. The concrete interception method comprises the following specific operation method steps that S1, assembly body blocking plates, bottom opening round head cones and horizontal fixing steel plates of different specifications are selected and moved to a construction site; s2, after beam steel bars are bound and cleaned, stirrups are selected at the designated positions of column joints, horizontal fixing steel plates are placed, assembly body blocking steel plates penetrate through the steel bar intervals to be sequentially installed, and the assembly body blocking steel plates are connected into a whole through rabbets and tongues; s3, horizontal fixing steel plates are placed as bases and used for containing clamping groove fixing steel plates, and the assembly fixing steel plates at the ends are fixed through fixing steel plate clamping grooves; s4, a structural body is installed on the end assembly body blocking steel plate; s5, concrete is poured in a layered mode; and S6, after concrete is poured and formed, the barrier steel plates are sequentially dismantled. The bottom opening sealing structure can achieve the effect of enhancing the overall concrete impact resistance, has better stability and can solve the problem that the bottom opening sealing effect is poor.
本发明公开了一种混凝土拦截方法及装配式混凝土拦截施工组件,包括以下具体操作方法步骤:S1.选用不同规格的装配体阻隔板、底口圆头锥体、水平固定钢板,并移动至施工现场;S2.梁钢筋绑扎清理完成后选择柱节点指定位置箍筋,放置水平固定钢板,将装配体阻隔钢板穿过钢筋间距依次安装,装配体阻隔钢板通过企口连接形成整体;S3.放置水平固定钢板作为底座,用于放置卡槽固定钢板,端部的装配体固定钢板通过固定钢板卡槽固定;S4.在端部装配体阻隔钢板上安装结构体;S5.混凝土分层浇筑;S6.混凝土浇筑成型后依次拆除阻隔钢板。本发明能够起到加强整体抵抗混凝土冲击的作用,具有更好稳固性的同时能够解决底口封堵效果差的问题。
Concrete intercepting method and assembly type concrete intercepting construction assembly
一种混凝土拦截方法及装配式混凝土拦截施工组件
DING SHIHONG (author) / DING JIE (author) / YANG HONGRUI (author) / LIU WEI (author) / WANG BIAO (author) / ZHANG SHIBAO (author) / SHI TONGLAI (author) / BAO WANGLONG (author) / LIANG LEI (author)
2024-08-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2022
|Concrete intercepting device for concrete construction joint
European Patent Office | 2023
|Concrete intercepting device and construction method thereof
European Patent Office | 2023
|Intercepting device, intercepting well and intercepting method
European Patent Office | 2024
|Anti-silting intercepting ditch assembly and intercepting ditch adopting same
European Patent Office | 2021
|