Protection system for debris flow induced by side slope slag hanging in construction period and construction method
The invention discloses a construction method of a protection system for debris flow induced by side slope slag hanging in the construction period. The protection system comprises a rotary energy dissipation fender pile group arranged at the position of a gully bealock. A reinforced gabion array is arranged at the gully outlet and comprises a plurality of reinforced gabions arranged in the shape of a Chinese character'pin '. The triangular lateral notches of the reinforced gabion array are provided with water passing blocking nets for secondary blocking of rock ballast in debris flow. The periphery of the reinforced gabion array is provided with a permeable impoundment pool which is used for precipitating silt in debris flow and is arranged in an opening mode; a flow guide notch is formed in the open side edge of the water-permeable retaining pond, and a drainage guide groove used for drainage of water flow and a plant protection belt used for foundation fixing of the construction platform needing to be protected are arranged on the periphery of the water-permeable retaining pond. The device has the technical characteristics of convenience in assembly, disassembly and cleaning, recyclability and the like, and is very suitable for temporary protection of debris flow induced by gully slope slag adhesion during construction.
本发明公开了一种施工期边坡挂渣诱发泥石流的防护系统的施工方法。该防护系统包括设置在冲沟垭口处的旋转式消能护桩群;所述冲沟出口位置处设置有钢筋石笼阵列,所述钢筋石笼阵列包括若干个呈品字型布置的钢筋石笼;所述钢筋石笼阵列品字型侧向缺口设置有对泥石流中石渣进行二次拦截的过水拦滞网;所述钢筋石笼阵列外围设置有用于沉淀泥石流中泥沙、呈开口型布置的透水拦蓄池;所述透水拦蓄池开口型侧边设置导流缺口,所述透水拦蓄池外围设置有用于引排水流的导排沟槽及对需保护施工平台进行固基作用的植物防护带。本发明具有安拆及清理方便、可循环利用等技术特点,十分适合在施工期对冲沟边坡挂渣诱发的泥石流进行临时防护。
Protection system for debris flow induced by side slope slag hanging in construction period and construction method
The invention discloses a construction method of a protection system for debris flow induced by side slope slag hanging in the construction period. The protection system comprises a rotary energy dissipation fender pile group arranged at the position of a gully bealock. A reinforced gabion array is arranged at the gully outlet and comprises a plurality of reinforced gabions arranged in the shape of a Chinese character'pin '. The triangular lateral notches of the reinforced gabion array are provided with water passing blocking nets for secondary blocking of rock ballast in debris flow. The periphery of the reinforced gabion array is provided with a permeable impoundment pool which is used for precipitating silt in debris flow and is arranged in an opening mode; a flow guide notch is formed in the open side edge of the water-permeable retaining pond, and a drainage guide groove used for drainage of water flow and a plant protection belt used for foundation fixing of the construction platform needing to be protected are arranged on the periphery of the water-permeable retaining pond. The device has the technical characteristics of convenience in assembly, disassembly and cleaning, recyclability and the like, and is very suitable for temporary protection of debris flow induced by gully slope slag adhesion during construction.
本发明公开了一种施工期边坡挂渣诱发泥石流的防护系统的施工方法。该防护系统包括设置在冲沟垭口处的旋转式消能护桩群;所述冲沟出口位置处设置有钢筋石笼阵列,所述钢筋石笼阵列包括若干个呈品字型布置的钢筋石笼;所述钢筋石笼阵列品字型侧向缺口设置有对泥石流中石渣进行二次拦截的过水拦滞网;所述钢筋石笼阵列外围设置有用于沉淀泥石流中泥沙、呈开口型布置的透水拦蓄池;所述透水拦蓄池开口型侧边设置导流缺口,所述透水拦蓄池外围设置有用于引排水流的导排沟槽及对需保护施工平台进行固基作用的植物防护带。本发明具有安拆及清理方便、可循环利用等技术特点,十分适合在施工期对冲沟边坡挂渣诱发的泥石流进行临时防护。
Protection system for debris flow induced by side slope slag hanging in construction period and construction method
施工期边坡挂渣诱发泥石流的防护系统及施工方法
WANG YOULE (author) / MIAO ZHENGJIAN (author) / ZHANG BO (author) / ZHANG ZHIJUN (author) / PAN SHAOHUA (author) / LI BIN (author) / WANG HUANZHAN (author) / LIU WEN (author) / WANG SHENGBIN (author) / SHU YAOHUI (author)
2024-08-16
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
A01G
Gartenbau
,
HORTICULTURE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
/
E03F
SEWERS
,
Abwasserkanäle
High and steep slope construction period hanging slag treatment system and method and application
European Patent Office | 2024
|Side slope hanging net anchor-shotcrete supporting device and construction method
European Patent Office | 2024
|European Patent Office | 2024
|Slope protection brick for laying side slope and construction method of slope protection brick
European Patent Office | 2024
|Construction method of high-fill side slope lattice protection slope
European Patent Office | 2024
|