High and steep slope construction period hanging slag treatment system and method and application
The invention discloses a slag adhering treatment system and method for the construction period of a high and steep slope, and the system comprises a directional slag sliding channel, a slope bottom construction platform and a first blocking system which is used for excavating the width lt of the construction platform where construction is conducted; the construction period is 1m; the second blocking system is used in the construction period after the width of the construction platform where excavation construction is conducted is larger than or equal to 1 m; the second blocking system is formed by a fence, and the second blocking system is arranged on a construction platform where excavation construction is carried out; the first treatment system is used for the stage after slope excavation and supporting are completed; the first treatment system comprises regreening plants; and the first treatment system is arranged on the side slope below the excavation side slope. The method has the technical characteristics that the main body structure is simple, the material price is low, manufacturing and mounting are convenient, recycling and cyclic utilization are achieved, and slope greening preliminary treatment is conducted in advance in the construction period, high practicability and operability are achieved, and the slag adhering problem of the high and steep slope in the construction period can be effectively solved.
本发明公开了一种高陡边坡施工期挂渣治理系统和方法,该系统包括:定向溜渣通道、坡底施工平台和第一拦挡系统,用于开挖施工所在的施工平台的宽度<1m的施工期间;第二拦挡系统,用于开挖施工所在的施工平台的宽度≥1m后的施工期间;所述第二拦挡系统由围挡形成,所述第二拦挡系统设置在所述开挖施工所在的施工平台上;第一治理系统,用于边坡开挖、支护完成后的阶段;所述第一治理系统包括复绿植物;所述第一治理系统设置在开挖边坡下方边坡上。本发明具有主体结构简单、材料价格实惠、制作安装方便、可回收循环利用、在施工期提前进行边坡复绿初步治理等技术特点,具有较强的实用性和可操作性,可有效治理高陡边坡施工期挂渣问题。
High and steep slope construction period hanging slag treatment system and method and application
The invention discloses a slag adhering treatment system and method for the construction period of a high and steep slope, and the system comprises a directional slag sliding channel, a slope bottom construction platform and a first blocking system which is used for excavating the width lt of the construction platform where construction is conducted; the construction period is 1m; the second blocking system is used in the construction period after the width of the construction platform where excavation construction is conducted is larger than or equal to 1 m; the second blocking system is formed by a fence, and the second blocking system is arranged on a construction platform where excavation construction is carried out; the first treatment system is used for the stage after slope excavation and supporting are completed; the first treatment system comprises regreening plants; and the first treatment system is arranged on the side slope below the excavation side slope. The method has the technical characteristics that the main body structure is simple, the material price is low, manufacturing and mounting are convenient, recycling and cyclic utilization are achieved, and slope greening preliminary treatment is conducted in advance in the construction period, high practicability and operability are achieved, and the slag adhering problem of the high and steep slope in the construction period can be effectively solved.
本发明公开了一种高陡边坡施工期挂渣治理系统和方法,该系统包括:定向溜渣通道、坡底施工平台和第一拦挡系统,用于开挖施工所在的施工平台的宽度<1m的施工期间;第二拦挡系统,用于开挖施工所在的施工平台的宽度≥1m后的施工期间;所述第二拦挡系统由围挡形成,所述第二拦挡系统设置在所述开挖施工所在的施工平台上;第一治理系统,用于边坡开挖、支护完成后的阶段;所述第一治理系统包括复绿植物;所述第一治理系统设置在开挖边坡下方边坡上。本发明具有主体结构简单、材料价格实惠、制作安装方便、可回收循环利用、在施工期提前进行边坡复绿初步治理等技术特点,具有较强的实用性和可操作性,可有效治理高陡边坡施工期挂渣问题。
High and steep slope construction period hanging slag treatment system and method and application
高陡边坡施工期挂渣治理系统及方法和应用
WANG YOULE (author) / MIAO ZHENGJIAN (author) / ZHANG BO (author) / ZHANG ZHIJUN (author) / PAN SHAOHUA (author) / CHENG XUECHEN (author) / YUE CHAOJUN (author) / XU GUOWEI (author) / CHEN HAO (author) / CHEN JIAN (author)
2024-09-20
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
A01C
Pflanzen
,
PLANTING
/
A01G
Gartenbau
,
HORTICULTURE
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2022
|Hanging net greening and repairing structure and method for steep high slope rock mountain
European Patent Office | 2023
|