A platform for research: civil engineering, architecture and urbanism
Construction method for wind-resistant device of building shock insulation project
The invention discloses a construction method for a wind-resistant device of a building shock insulation project. The construction method comprises the steps of construction preparation, construction of a lower buttress, installation of the wind-resistant device, construction of an upper buttress and acceptance. Wherein the lower buttress construction comprises the steps of lower buttress steel bar binding, lower buttress embedded part installation, lower buttress template preparation, lower buttress concrete pouring, lower buttress template removal and concrete curing; the installation of the wind-resistant device comprises the steps of cleaning laitance grinding stones and stains on the pre-embedded plate, installing the wind-resistant device, and carrying out acceptance inspection; the upper buttress construction comprises the steps of upper buttress embedded part installation, upper buttress steel bar binding, upper buttress template construction, upper buttress concrete construction, upper buttress template removal and concrete curing. The wind-resistant device is installed and cooperates with the building to resist damage of wind power. Through the technology, the energy of building shaking caused by wind power can be counteracted, so that the stability and durability of the building are improved, and the structural safety of the building is ensured.
本发明公开了一种建筑隔震工程抗风装置施工方法,包括:施工准备、下支墩施工、抗风装置安装、上支墩施工以及验收;其中,下支墩施工包括:下支墩钢筋绑扎、下支墩预埋件安装、下支墩模板、下支墩混凝土浇筑、下支墩模板拆除及混凝土养护;抗风装置安装包括:清理浮浆打磨石子及预埋板上污渍、抗风装置安装、验收;上支墩施工包括:上支墩预埋件安装、上支墩钢筋绑扎、上支墩模板、上支墩混凝土、上支墩模板拆除及混凝土养护。本发明通过安装抗风装置,与建筑物本身协同抵抗风力的破坏。通过这样的技术,可以把风力致使建筑物晃动的能量抵消掉,从而提高建筑物的稳定性、耐久性,确保建筑物的结构安全。
Construction method for wind-resistant device of building shock insulation project
The invention discloses a construction method for a wind-resistant device of a building shock insulation project. The construction method comprises the steps of construction preparation, construction of a lower buttress, installation of the wind-resistant device, construction of an upper buttress and acceptance. Wherein the lower buttress construction comprises the steps of lower buttress steel bar binding, lower buttress embedded part installation, lower buttress template preparation, lower buttress concrete pouring, lower buttress template removal and concrete curing; the installation of the wind-resistant device comprises the steps of cleaning laitance grinding stones and stains on the pre-embedded plate, installing the wind-resistant device, and carrying out acceptance inspection; the upper buttress construction comprises the steps of upper buttress embedded part installation, upper buttress steel bar binding, upper buttress template construction, upper buttress concrete construction, upper buttress template removal and concrete curing. The wind-resistant device is installed and cooperates with the building to resist damage of wind power. Through the technology, the energy of building shaking caused by wind power can be counteracted, so that the stability and durability of the building are improved, and the structural safety of the building is ensured.
本发明公开了一种建筑隔震工程抗风装置施工方法,包括:施工准备、下支墩施工、抗风装置安装、上支墩施工以及验收;其中,下支墩施工包括:下支墩钢筋绑扎、下支墩预埋件安装、下支墩模板、下支墩混凝土浇筑、下支墩模板拆除及混凝土养护;抗风装置安装包括:清理浮浆打磨石子及预埋板上污渍、抗风装置安装、验收;上支墩施工包括:上支墩预埋件安装、上支墩钢筋绑扎、上支墩模板、上支墩混凝土、上支墩模板拆除及混凝土养护。本发明通过安装抗风装置,与建筑物本身协同抵抗风力的破坏。通过这样的技术,可以把风力致使建筑物晃动的能量抵消掉,从而提高建筑物的稳定性、耐久性,确保建筑物的结构安全。
Construction method for wind-resistant device of building shock insulation project
建筑隔震工程抗风装置施工方法
WU YUANJIN (author)
2024-08-20
Patent
Electronic Resource
Chinese
Construction method of novel building shock insulation project wind-resistant device
European Patent Office | 2024
|Shock insulation system for shock insulation building and construction method
European Patent Office | 2024
|European Patent Office | 2020
|Wind-resistant device and shock insulation layer adopting same
European Patent Office | 2021
|