Sliding groove construction method for bolt connection
The invention discloses a sliding chute construction method for bolt connection, which comprises the following construction steps: S1, pre-burying a sliding chute rail in a concrete structure according to the construction stage of the concrete structure, and controlling the position of the sliding chute rail in the horizontal direction; s2, in the curtain wall construction stage, bolts are placed in the sliding groove rails; s3, the bolts are adjusted in the horizontal direction according to the curtain wall panel and the actual site situation, and the overall position of the vertical stile and the curtain wall panel is fixed through the bolts; and S4, after the whole positions of the vertical sticks and the curtain wall panels of the same floor are fixed, nuts outside the bolts are tightened, and the installation work of the curtain wall panels is completed. By the adoption of the construction method, the bolts are connected in a sliding groove mode, internal gaps in the back faces of the bolts at the connecting joints can be reduced, and the integrity of stress stability of the joints is improved.
本发明公开了一种用于螺栓连接的滑槽施工方法,包括以下施工步骤:S1:根据混凝土结构施工阶段将滑槽轨道预埋在混凝土结构中,控制滑槽轨道水平方向位置;S2:幕墙施工阶段,将螺栓放置到滑槽轨道中;S3:根据幕墙面板和现场实际情况在水平方向上调整螺栓,通过螺栓固定竖向的竖梃和幕墙面板的整体位置;S4:待同一楼层竖梃和幕墙面板整体位置固定好后,拧紧螺栓外部的螺帽,完成幕墙面板的安装工作。采用本发明的施工方法,螺栓通过滑槽的方式进行连接,可减少连接节点处螺栓背面的内部缝隙,提高节点受力稳定的整体性。
Sliding groove construction method for bolt connection
The invention discloses a sliding chute construction method for bolt connection, which comprises the following construction steps: S1, pre-burying a sliding chute rail in a concrete structure according to the construction stage of the concrete structure, and controlling the position of the sliding chute rail in the horizontal direction; s2, in the curtain wall construction stage, bolts are placed in the sliding groove rails; s3, the bolts are adjusted in the horizontal direction according to the curtain wall panel and the actual site situation, and the overall position of the vertical stile and the curtain wall panel is fixed through the bolts; and S4, after the whole positions of the vertical sticks and the curtain wall panels of the same floor are fixed, nuts outside the bolts are tightened, and the installation work of the curtain wall panels is completed. By the adoption of the construction method, the bolts are connected in a sliding groove mode, internal gaps in the back faces of the bolts at the connecting joints can be reduced, and the integrity of stress stability of the joints is improved.
本发明公开了一种用于螺栓连接的滑槽施工方法,包括以下施工步骤:S1:根据混凝土结构施工阶段将滑槽轨道预埋在混凝土结构中,控制滑槽轨道水平方向位置;S2:幕墙施工阶段,将螺栓放置到滑槽轨道中;S3:根据幕墙面板和现场实际情况在水平方向上调整螺栓,通过螺栓固定竖向的竖梃和幕墙面板的整体位置;S4:待同一楼层竖梃和幕墙面板整体位置固定好后,拧紧螺栓外部的螺帽,完成幕墙面板的安装工作。采用本发明的施工方法,螺栓通过滑槽的方式进行连接,可减少连接节点处螺栓背面的内部缝隙,提高节点受力稳定的整体性。
Sliding groove construction method for bolt connection
用于螺栓连接的滑槽施工方法
LIU KANG (author) / CHEN WEIHENG (author) / TAO YUHONG (author) / PENG ZHOU (author)
2024-08-23
Patent
Electronic Resource
Chinese
Anti-sliding mixed type high-strength bolt connection joint and construction method thereof
European Patent Office | 2024
|Bolt connection and swivel lever with bolt connection for construction machine
European Patent Office | 2019
|BOLT CONNECTION AND SWIVEL LEVER WITH BOLT CONNECTION FOR CONSTRUCTION MACHINE
European Patent Office | 2017
|Fabricated parapet wall bolt connection construction method
European Patent Office | 2022
|