A platform for research: civil engineering, architecture and urbanism
Steel-UHPC combined box girder cable-stayed bridge and construction method thereof
The invention discloses a steel-UHPC combined box girder cable-stayed bridge and a construction method thereof.The steel-UHPC combined box girder cable-stayed bridge comprises a plurality of steel-UHPC combined wide box girder units used for forming a bridge girder, each steel-UHPC combined wide box girder unit comprises a plurality of prefabricated UHPC bridge deck slabs and a steel box girder combined structure, and the prefabricated UHPC bridge deck slabs are connected through UHPC wet joints; and meanwhile, the prefabricated UHPC bridge deck slab and the steel box girder combined structure are connected into a whole through the UHPC wet joints. The steel-UHPC combined box girder cable-stayed bridge has the advantages of being small in shrinkage stress, short in construction period and high in crack resistance. The construction method of the steel-UHPC combined box girder cable-stayed bridge has the advantages that the construction steps can be reduced, and the construction period can be greatly shortened.
本发明公开了一种钢‑UHPC组合箱梁斜拉桥及其施工方法,包括多个用于形成桥梁主梁的钢‑UHPC组合宽箱梁单元,钢‑UHPC组合宽箱梁单元包括多块预制UHPC桥面板和钢箱梁组合结构,各预制UHPC桥面板之间通过UHPC湿接缝连接,同时UHPC湿接缝还将预制UHPC桥面板与钢箱梁组合结构连接成一体。该钢‑UHPC组合箱梁斜拉桥具有收缩应力小、施工周期短、抗裂性能高的优点,该钢‑UHPC组合箱梁斜拉桥的施工方法具有能够减少施工步骤,大幅缩短施工周期的优点。
Steel-UHPC combined box girder cable-stayed bridge and construction method thereof
The invention discloses a steel-UHPC combined box girder cable-stayed bridge and a construction method thereof.The steel-UHPC combined box girder cable-stayed bridge comprises a plurality of steel-UHPC combined wide box girder units used for forming a bridge girder, each steel-UHPC combined wide box girder unit comprises a plurality of prefabricated UHPC bridge deck slabs and a steel box girder combined structure, and the prefabricated UHPC bridge deck slabs are connected through UHPC wet joints; and meanwhile, the prefabricated UHPC bridge deck slab and the steel box girder combined structure are connected into a whole through the UHPC wet joints. The steel-UHPC combined box girder cable-stayed bridge has the advantages of being small in shrinkage stress, short in construction period and high in crack resistance. The construction method of the steel-UHPC combined box girder cable-stayed bridge has the advantages that the construction steps can be reduced, and the construction period can be greatly shortened.
本发明公开了一种钢‑UHPC组合箱梁斜拉桥及其施工方法,包括多个用于形成桥梁主梁的钢‑UHPC组合宽箱梁单元,钢‑UHPC组合宽箱梁单元包括多块预制UHPC桥面板和钢箱梁组合结构,各预制UHPC桥面板之间通过UHPC湿接缝连接,同时UHPC湿接缝还将预制UHPC桥面板与钢箱梁组合结构连接成一体。该钢‑UHPC组合箱梁斜拉桥具有收缩应力小、施工周期短、抗裂性能高的优点,该钢‑UHPC组合箱梁斜拉桥的施工方法具有能够减少施工步骤,大幅缩短施工周期的优点。
Steel-UHPC combined box girder cable-stayed bridge and construction method thereof
一种钢-UHPC组合箱梁斜拉桥及其施工方法
ZHAO HUA (author) / LUO SUI (author) / QIAO DONGQIN (author) / HU JUNDE (author) / SUN TAO (author) / SHAO XUDONG (author) / ZHAO RUOYI (author)
2024-08-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Cable-stayed bridge steel box girder pushing construction method
European Patent Office | 2020
|Construction method of girder of steel box girder cable-stayed bridge
European Patent Office | 2023
|Construction method of steel box girder cable-stayed bridge
European Patent Office | 2024
|Cable-stayed bridge box girder and construction method thereof
European Patent Office | 2022
|Steel truss girder of highway-railway combined cable-stayed bridge
European Patent Office | 2021
|