Water conservancy project slope protection construction method
The invention relates to the technical field of slope protection, in particular to a hydraulic engineering slope protection construction method which comprises the following steps: step 1, cleaning a slope surface, namely cutting off weeds on the slope surface by using a mower, and removing broken stones and the like on the slope surface after the weeds are removed; secondly, the slope surface is leveled, potholes in the slope surface are filled according to the design angle of the slope surface, soil transfer is conducted on protrusions on the slope surface till the slope surface is leveled, and the angle meets the design angle; thirdly, concrete pouring is conducted, latticed concrete is poured on the leveled slope surface, and after the concrete is dried, a layer of loose sand is laid in grids formed by the concrete; fourthly, the protective building bricks are stacked, and after the protective building bricks are moved to preset positions through auxiliary carrying equipment, the protective building bricks are laid manually; and fifthly, after the protective building bricks are laid, the slope surface is covered with a protective net, water and soil of the slope surface are kept stable, and slope surface collapse caused by water and soil loss is avoided.
本发明涉及护坡技术领域,具体是一种水利工程护坡施工方法,包括以下步骤:步骤一:清理坡面,使用割草机将坡面上的杂草割除,并在将杂草清除后,将坡面上的碎石等移除;步骤二:平整坡面,按照坡面的设计角度对坡面上的坑洼处进行填充,对坡面上的凸起处进行土壤移送,直至坡面平整,角度符合设计角度;步骤三:混凝土浇筑,在平整后的坡面上浇筑网格状混凝土,待混凝土干燥后,在混凝土形成的网格内铺设一层散沙;步骤四:护砌砖码放,使用辅助搬运设备将护砌砖移动时预定位置后,由人工进行铺设;步骤五:护砌砖铺设完成后,使用防护网对坡面进行覆盖,保持坡面的水土稳定,避免水土流失导致坡面坍塌。
Water conservancy project slope protection construction method
The invention relates to the technical field of slope protection, in particular to a hydraulic engineering slope protection construction method which comprises the following steps: step 1, cleaning a slope surface, namely cutting off weeds on the slope surface by using a mower, and removing broken stones and the like on the slope surface after the weeds are removed; secondly, the slope surface is leveled, potholes in the slope surface are filled according to the design angle of the slope surface, soil transfer is conducted on protrusions on the slope surface till the slope surface is leveled, and the angle meets the design angle; thirdly, concrete pouring is conducted, latticed concrete is poured on the leveled slope surface, and after the concrete is dried, a layer of loose sand is laid in grids formed by the concrete; fourthly, the protective building bricks are stacked, and after the protective building bricks are moved to preset positions through auxiliary carrying equipment, the protective building bricks are laid manually; and fifthly, after the protective building bricks are laid, the slope surface is covered with a protective net, water and soil of the slope surface are kept stable, and slope surface collapse caused by water and soil loss is avoided.
本发明涉及护坡技术领域,具体是一种水利工程护坡施工方法,包括以下步骤:步骤一:清理坡面,使用割草机将坡面上的杂草割除,并在将杂草清除后,将坡面上的碎石等移除;步骤二:平整坡面,按照坡面的设计角度对坡面上的坑洼处进行填充,对坡面上的凸起处进行土壤移送,直至坡面平整,角度符合设计角度;步骤三:混凝土浇筑,在平整后的坡面上浇筑网格状混凝土,待混凝土干燥后,在混凝土形成的网格内铺设一层散沙;步骤四:护砌砖码放,使用辅助搬运设备将护砌砖移动时预定位置后,由人工进行铺设;步骤五:护砌砖铺设完成后,使用防护网对坡面进行覆盖,保持坡面的水土稳定,避免水土流失导致坡面坍塌。
Water conservancy project slope protection construction method
一种水利工程护坡施工方法
LI SHUFENG (author) / ZHOU QING (author) / SHEN ERNING (author) / HU FANGFANG (author) / GUO ZANZAN (author) / LI JUNYI (author)
2024-08-27
Patent
Electronic Resource
Chinese
Water conservancy project slope protection construction method
European Patent Office | 2024
|Water conservancy project slope protection construction method
European Patent Office | 2023
|Water conservancy project construction slope protection structure
European Patent Office | 2024
|Water conservancy project river channel slope protection construction method
European Patent Office | 2024
|