The invention provides a convenient and fast installation method for a directly-buried conical discharging hopper, which comprises the following steps: 1, manufacturing the conical discharging hopper according to process parameters, and installing a plurality of groups of anchoring steel bars in the circumference of a preset position at the upper part of the discharging hopper; secondly, a conical discharging hopper is installed, before a concrete structure is poured, after a steel bar formwork is installed and accepted to be qualified, the position of a discharging hopper structure is reserved on a scaffold below an installation area, and then the conical discharging hopper is hoisted to a designated position to be installed; and thirdly, concrete pouring is conducted, and after the plane position and the elevation of the conical discharging hopper are calibrated to be qualified, concrete pouring is conducted. According to the installation method, the conical discharging hopper is easy to manufacture and convenient to install, the construction period is shortened, time and labor are saved, materials are convenient to clean, the welding quality, the installation precision and the construction safety are guaranteed, and the concrete structure and the conical discharging hopper form a whole which is firm and reliable.
本发明提供了本发明提出了一种便捷的直埋式锥形下料漏斗安装方法,包括一、制作锥形下料漏斗,按照工艺参数制作,在下料漏斗上部预设位置圆周内安装多组锚固钢筋;二、安装锥形下料漏斗,混凝土结构浇筑前、钢筋模板安装完成且验收合格后,在安装区域下方脚手架预留下料漏斗结构位置,然后将锥形下料漏斗吊至指定位置安装;三、混凝土浇筑,锥形下料漏斗的平面位置及标高校准合格后,浇筑混凝土。该安装方法,锥形下料漏斗制作简单,安装便利,缩减工期,省时省力,材料清理方便:保证了焊接质量、安装精度以及施工的安全性,混凝土结构与锥形下料漏斗形成整体,牢固可靠。
Convenient and fast installation method for direct-buried conical discharging hopper
The invention provides a convenient and fast installation method for a directly-buried conical discharging hopper, which comprises the following steps: 1, manufacturing the conical discharging hopper according to process parameters, and installing a plurality of groups of anchoring steel bars in the circumference of a preset position at the upper part of the discharging hopper; secondly, a conical discharging hopper is installed, before a concrete structure is poured, after a steel bar formwork is installed and accepted to be qualified, the position of a discharging hopper structure is reserved on a scaffold below an installation area, and then the conical discharging hopper is hoisted to a designated position to be installed; and thirdly, concrete pouring is conducted, and after the plane position and the elevation of the conical discharging hopper are calibrated to be qualified, concrete pouring is conducted. According to the installation method, the conical discharging hopper is easy to manufacture and convenient to install, the construction period is shortened, time and labor are saved, materials are convenient to clean, the welding quality, the installation precision and the construction safety are guaranteed, and the concrete structure and the conical discharging hopper form a whole which is firm and reliable.
本发明提供了本发明提出了一种便捷的直埋式锥形下料漏斗安装方法,包括一、制作锥形下料漏斗,按照工艺参数制作,在下料漏斗上部预设位置圆周内安装多组锚固钢筋;二、安装锥形下料漏斗,混凝土结构浇筑前、钢筋模板安装完成且验收合格后,在安装区域下方脚手架预留下料漏斗结构位置,然后将锥形下料漏斗吊至指定位置安装;三、混凝土浇筑,锥形下料漏斗的平面位置及标高校准合格后,浇筑混凝土。该安装方法,锥形下料漏斗制作简单,安装便利,缩减工期,省时省力,材料清理方便:保证了焊接质量、安装精度以及施工的安全性,混凝土结构与锥形下料漏斗形成整体,牢固可靠。
Convenient and fast installation method for direct-buried conical discharging hopper
一种便捷的直埋式锥形下料漏斗安装方法
ZHANG HAO (author) / LI HUAXING (author) / ZHANG YONGBO (author) / LEI YUANPENG (author) / QIN SHILONG (author)
2024-08-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Conical hopper construction device and construction method