A platform for research: civil engineering, architecture and urbanism
Arrangement method of reactor building, reactor building and cooling method of reactor building
The invention discloses an arrangement method of a reactor building, the reactor building and a cooling method of the reactor building, which can reduce the volume of a safe built-in water tank under the condition that the volume of the safe built-in water tank meets the cooling requirement of the reactor building, and can reduce the volume of the safe built-in water tank under the condition that the total size of a containment does not need to be increased. Other parts of the main equipment of the reactor can still be arranged in the reactor building, so that the construction cost of the reactor building can be reduced, and the economical efficiency is improved. The method comprises the following steps: dividing the interior of a containment (6) into a reactor pit area and an equipment mounting area from bottom to top in sequence; a safe built-in water tank (7) of the reactor cavity water injection cooling system is arranged in the equipment mounting area, and other parts in the reactor main equipment are arranged in the equipment mounting area; wherein the volume of the safe built-in water tank (7) is set as follows: after cooling water in the safe built-in water tank (7) is led out, the reactor pit (1) and the main pipeline can be completely submerged.
本发明公开了一种反应堆厂房的布置方法、反应堆厂房及其冷却方法,能够使安全内置水箱的容量满足反应堆厂房的冷却要求的情况下减小安全内置水箱的容积,且在无需增加安全壳的总尺寸的情况下,使反应堆主设备的其他部件仍然可以布置在反应堆厂房内,从而可以降低反应堆厂房的建造成本,提高经济性。该方法包括如下步骤:将安全壳(6)内部从下到上依次划分为堆坑区、设备安装区;将堆腔注水冷却系统的安全内置水箱(7)布置在设备安装区,将反应堆主设备中的其他部件布置在设备安装区;其中,安全内置水箱(7)的容积设置为:在安全内置水箱(7)内的冷却水导出后,能够将堆坑(1)以及主管道完全淹没。
Arrangement method of reactor building, reactor building and cooling method of reactor building
The invention discloses an arrangement method of a reactor building, the reactor building and a cooling method of the reactor building, which can reduce the volume of a safe built-in water tank under the condition that the volume of the safe built-in water tank meets the cooling requirement of the reactor building, and can reduce the volume of the safe built-in water tank under the condition that the total size of a containment does not need to be increased. Other parts of the main equipment of the reactor can still be arranged in the reactor building, so that the construction cost of the reactor building can be reduced, and the economical efficiency is improved. The method comprises the following steps: dividing the interior of a containment (6) into a reactor pit area and an equipment mounting area from bottom to top in sequence; a safe built-in water tank (7) of the reactor cavity water injection cooling system is arranged in the equipment mounting area, and other parts in the reactor main equipment are arranged in the equipment mounting area; wherein the volume of the safe built-in water tank (7) is set as follows: after cooling water in the safe built-in water tank (7) is led out, the reactor pit (1) and the main pipeline can be completely submerged.
本发明公开了一种反应堆厂房的布置方法、反应堆厂房及其冷却方法,能够使安全内置水箱的容量满足反应堆厂房的冷却要求的情况下减小安全内置水箱的容积,且在无需增加安全壳的总尺寸的情况下,使反应堆主设备的其他部件仍然可以布置在反应堆厂房内,从而可以降低反应堆厂房的建造成本,提高经济性。该方法包括如下步骤:将安全壳(6)内部从下到上依次划分为堆坑区、设备安装区;将堆腔注水冷却系统的安全内置水箱(7)布置在设备安装区,将反应堆主设备中的其他部件布置在设备安装区;其中,安全内置水箱(7)的容积设置为:在安全内置水箱(7)内的冷却水导出后,能够将堆坑(1)以及主管道完全淹没。
Arrangement method of reactor building, reactor building and cooling method of reactor building
反应堆厂房的布置方法、反应堆厂房及其冷却方法
BAI BINGHE (author) / GU ZHENJIE (author) / FAN YANFANG (author) / JIA XIAOPAN (author) / ZHAO XIAOSHAN (author) / BEI CHEN (author) / HAO DONG (author) / WANG ZHENZHONG (author) / XUE JING (author) / WU QIAOYING (author)
2024-08-27
Patent
Electronic Resource
Chinese
Arrangement method of reactor building, reactor building and cooling method of reactor building
European Patent Office | 2024
|Arrangement method of reactor building, reactor building and cooling method of reactor building
European Patent Office | 2024
|