Construction method of attached type lifting scaffold on step type variable cross-section building
The invention provides a construction method of an attached lifting scaffold on a step-type variable-cross-section building, which comprises the following steps of: removing parts on two sides of a lifting scaffold body mounted on the side wall of the lower part of a building step, mounting a scissor jack on the side wall of the upper part of the building step at a position corresponding to a guide rail of the lifting scaffold body, and lifting the lifting scaffold body; the height of the lifting scaffold body is increased, and the scissor jacks are compressed from top to bottom until the scissor jacks on the upper portion and the lower portion of the lifting scaffold body are all compressed to be the shortest. The scissor jack is arranged, the position of the guide rail base in the horizontal direction is adjusted through the scissor jack, the lifting scaffold on the lower portion of the building step can be directly lifted to the upper portion of the building step, and then the distance between the lifting scaffold body and the side wall of the building is gradually reduced through the scissor jack; the lifting scaffold is shrunk to be matched with the upper portion of a building step in size.
本发明提供了一种附着式升降脚手架在台阶型变截面建筑上的施工方法,包括以下步骤,将安装于楼体台阶下部侧壁的升降脚手架架体两侧的部位拆除,在楼体台阶上部侧壁与升降脚手架架体导轨向对应位置处安装剪式千斤顶,提升升降脚手架架体高度按照从上至下的顺序压缩剪式千斤顶,直至升降脚手架架体上部和下部剪式千斤顶全部压缩至最短。本发明通过设置剪式千斤顶,通过剪式千斤顶调整导轨座在水平方向的位置,可直接将楼体台阶下部的升降脚手架提升至楼体台阶上部,然后通过剪式千斤顶逐步减小升降脚手架架体与楼体侧壁之间的距离,实现将升降脚手架缩小进而与楼体台阶上部大小相适配。
Construction method of attached type lifting scaffold on step type variable cross-section building
The invention provides a construction method of an attached lifting scaffold on a step-type variable-cross-section building, which comprises the following steps of: removing parts on two sides of a lifting scaffold body mounted on the side wall of the lower part of a building step, mounting a scissor jack on the side wall of the upper part of the building step at a position corresponding to a guide rail of the lifting scaffold body, and lifting the lifting scaffold body; the height of the lifting scaffold body is increased, and the scissor jacks are compressed from top to bottom until the scissor jacks on the upper portion and the lower portion of the lifting scaffold body are all compressed to be the shortest. The scissor jack is arranged, the position of the guide rail base in the horizontal direction is adjusted through the scissor jack, the lifting scaffold on the lower portion of the building step can be directly lifted to the upper portion of the building step, and then the distance between the lifting scaffold body and the side wall of the building is gradually reduced through the scissor jack; the lifting scaffold is shrunk to be matched with the upper portion of a building step in size.
本发明提供了一种附着式升降脚手架在台阶型变截面建筑上的施工方法,包括以下步骤,将安装于楼体台阶下部侧壁的升降脚手架架体两侧的部位拆除,在楼体台阶上部侧壁与升降脚手架架体导轨向对应位置处安装剪式千斤顶,提升升降脚手架架体高度按照从上至下的顺序压缩剪式千斤顶,直至升降脚手架架体上部和下部剪式千斤顶全部压缩至最短。本发明通过设置剪式千斤顶,通过剪式千斤顶调整导轨座在水平方向的位置,可直接将楼体台阶下部的升降脚手架提升至楼体台阶上部,然后通过剪式千斤顶逐步减小升降脚手架架体与楼体侧壁之间的距离,实现将升降脚手架缩小进而与楼体台阶上部大小相适配。
Construction method of attached type lifting scaffold on step type variable cross-section building
一种附着式升降脚手架在台阶型变截面建筑上的施工方法
LI GUOCHENG (author) / SHEN YANXUE (author) / GONG BO (author) / DU CHONGFEI (author) / WANG TIANXIN (author) / DONG WANKUI (author) / LIU QIANG (author) / GONG ZHENKAI (author)
2024-08-30
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of attached lifting scaffold in variable cross-section super high-rise building
European Patent Office | 2020
|Super high-rise variable cross-section attached lifting scaffold
European Patent Office | 2023
|Super high-rise variable cross-section attached lifting scaffold
European Patent Office | 2024
|