Land area hydraulic reclamation construction method
A land area hydraulic reclamation construction method comprises the following steps that firstly, before use, a sand blowing device is placed on an enough working face, and all parts of the sand blowing device are assembled; 2, after the sand blowing device is installed, under the condition that it is confirmed that the sand blowing device is correct, sand is firstly fed into a sand collecting hopper, falls to the tail of a conveyor through the sand collecting hopper, and is conveyed to the top end of a mixing box through the conveyor and thrown out; thirdly, after the sand enters the mixing box, due to the fact that strong water flow provided by a water pump is arranged at the bottom of the mixing box, the sand can be immediately mixed with water to form a sand-water mixture after making contact with the water; and 4, the sand-water mixture in the mixing box is sucked in through a sand blowing pump and conveyed into the hydraulic reclamation area through a sand blowing pipe at the rear end of the sand blowing pump, and after the sand-water mixture is precipitated in the hydraulic reclamation area, sand is left in the hydraulic reclamation area. According to the land area hydraulic reclamation construction method, the construction speed can be increased, and the cost can be reduced.
一种陆域吹填施工方法,包括以下步骤:步骤一、使用前,将吹砂装置放置在足够的作业面上,并将吹砂装置的各部分装配好;步骤二、吹砂装置安装好后,在确认无误的情况下,首先将砂送入集砂斗,砂通过集砂斗落下到达输送机尾部,由输送机将砂运送到混合箱顶端并抛出;步骤三、砂在进入混合箱后,由于混合箱底部有水泵提供的强大水流,砂在与水接触后会立即与水混合形成砂水混合物;步骤四、混合箱内的砂水混合物通过吹砂泵吸入,经过吹砂泵后端的吹砂管输送到吹填区内,砂水混合物在吹填区内经过沉淀后,砂留在吹填区内。本发明提供的一种陆域吹填施工方法,可提高施工速度,降低成本。
Land area hydraulic reclamation construction method
A land area hydraulic reclamation construction method comprises the following steps that firstly, before use, a sand blowing device is placed on an enough working face, and all parts of the sand blowing device are assembled; 2, after the sand blowing device is installed, under the condition that it is confirmed that the sand blowing device is correct, sand is firstly fed into a sand collecting hopper, falls to the tail of a conveyor through the sand collecting hopper, and is conveyed to the top end of a mixing box through the conveyor and thrown out; thirdly, after the sand enters the mixing box, due to the fact that strong water flow provided by a water pump is arranged at the bottom of the mixing box, the sand can be immediately mixed with water to form a sand-water mixture after making contact with the water; and 4, the sand-water mixture in the mixing box is sucked in through a sand blowing pump and conveyed into the hydraulic reclamation area through a sand blowing pipe at the rear end of the sand blowing pump, and after the sand-water mixture is precipitated in the hydraulic reclamation area, sand is left in the hydraulic reclamation area. According to the land area hydraulic reclamation construction method, the construction speed can be increased, and the cost can be reduced.
一种陆域吹填施工方法,包括以下步骤:步骤一、使用前,将吹砂装置放置在足够的作业面上,并将吹砂装置的各部分装配好;步骤二、吹砂装置安装好后,在确认无误的情况下,首先将砂送入集砂斗,砂通过集砂斗落下到达输送机尾部,由输送机将砂运送到混合箱顶端并抛出;步骤三、砂在进入混合箱后,由于混合箱底部有水泵提供的强大水流,砂在与水接触后会立即与水混合形成砂水混合物;步骤四、混合箱内的砂水混合物通过吹砂泵吸入,经过吹砂泵后端的吹砂管输送到吹填区内,砂水混合物在吹填区内经过沉淀后,砂留在吹填区内。本发明提供的一种陆域吹填施工方法,可提高施工速度,降低成本。
Land area hydraulic reclamation construction method
一种陆域吹填施工方法
LUO YINGZHOU (author) / YI QINGMING (author) / CHEN WEIMING (author) / YU FANG (author) / TAN HUANG (author) / YANG HAIBO (author) / YE SHUNBO (author) / ZHAO JINWEI (author) / WANG XU (author)
2024-09-03
Patent
Electronic Resource
Chinese
Factory road construction method in hydraulic reclamation area
European Patent Office | 2020
|Land reclamation hydraulic structures
Online Contents | 1986
|Land reclamation hydraulic structures
Springer Verlag | 1986
|European Patent Office | 2024
|European Patent Office | 2023
|