A platform for research: civil engineering, architecture and urbanism
Cast-in-place pile pouring operation platform and using method
The invention relates to the technical field of building construction, in particular to a cast-in-place pile pouring operation platform and a using method.The cast-in-place pile pouring operation platform comprises two sets of first supporting bodies, two sets of second supporting bodies and a connecting sleeve, and the first supporting bodies and the second supporting bodies are symmetrically welded to the outer wall of the connecting sleeve; the lower ends of the first supporting body and the second supporting body are the same in structure and are I-shaped steel, a first supporting plate is fixedly welded to the upper end of the I-shaped steel of the first supporting body, and a second supporting plate is rotationally connected to the upper end of the I-shaped steel of the second supporting body through a hinge. Meanwhile, a measuring hole is reserved in the upper portion of the platform and can be used for measuring the length of a poured pile, follow-up pouring tasks can be conveniently judged, a first stable supporting body and a second stable supporting body are arranged on the upper portion of the operation platform and serve as a safe and stable operation area for workers, and a concrete guide pipe clamping plate arranged on the upper portion of the platform can clamp a guide pipe and guarantee safety when the guide pipe is disassembled.
本发明涉及建筑施工技术领域,具体为一种灌注桩灌注操作平台及使用方法,包括:支撑体一、支撑体二和连接套,支撑体一和支撑体二均设有两组,支撑体一和支撑体二对称焊接在连接套的外壁上,支撑体一和支撑体二下端的结构相同均为工字钢,支撑体一的工字钢上端固定焊接有支撑板一,支撑体二的工字钢的上端通过铰链转动连接有支撑板二,本装置可以保证混凝土导管位置固定,防止导管偏移造成导管断开等影响,同时平台上部留设测量孔,可以用于测量已浇筑桩长,便于判断后续浇筑任务,在操作平台上部设置稳定的支撑体一和支撑体二,为工人安全稳定的操作区域,平台上部设置的混凝土导管卡板,可以卡住导管,保证在拆卸导管时的安全。
Cast-in-place pile pouring operation platform and using method
The invention relates to the technical field of building construction, in particular to a cast-in-place pile pouring operation platform and a using method.The cast-in-place pile pouring operation platform comprises two sets of first supporting bodies, two sets of second supporting bodies and a connecting sleeve, and the first supporting bodies and the second supporting bodies are symmetrically welded to the outer wall of the connecting sleeve; the lower ends of the first supporting body and the second supporting body are the same in structure and are I-shaped steel, a first supporting plate is fixedly welded to the upper end of the I-shaped steel of the first supporting body, and a second supporting plate is rotationally connected to the upper end of the I-shaped steel of the second supporting body through a hinge. Meanwhile, a measuring hole is reserved in the upper portion of the platform and can be used for measuring the length of a poured pile, follow-up pouring tasks can be conveniently judged, a first stable supporting body and a second stable supporting body are arranged on the upper portion of the operation platform and serve as a safe and stable operation area for workers, and a concrete guide pipe clamping plate arranged on the upper portion of the platform can clamp a guide pipe and guarantee safety when the guide pipe is disassembled.
本发明涉及建筑施工技术领域,具体为一种灌注桩灌注操作平台及使用方法,包括:支撑体一、支撑体二和连接套,支撑体一和支撑体二均设有两组,支撑体一和支撑体二对称焊接在连接套的外壁上,支撑体一和支撑体二下端的结构相同均为工字钢,支撑体一的工字钢上端固定焊接有支撑板一,支撑体二的工字钢的上端通过铰链转动连接有支撑板二,本装置可以保证混凝土导管位置固定,防止导管偏移造成导管断开等影响,同时平台上部留设测量孔,可以用于测量已浇筑桩长,便于判断后续浇筑任务,在操作平台上部设置稳定的支撑体一和支撑体二,为工人安全稳定的操作区域,平台上部设置的混凝土导管卡板,可以卡住导管,保证在拆卸导管时的安全。
Cast-in-place pile pouring operation platform and using method
一种灌注桩灌注操作平台及使用方法
LIU XIAOLIANG (author) / LI XIAOXU (author)
2024-09-06
Patent
Electronic Resource
Chinese
Large-diameter cast-in-place pile underwater concrete pouring operation control platform
European Patent Office | 2022
|Cast-in-place concrete pile pouring device and pouring process
European Patent Office | 2023
|Underwater concrete pouring method for cast-in-place pile
European Patent Office | 2021
|