Construction method of transformer maintenance track structure
The invention discloses a construction method of a transformer maintenance track structure. The construction method comprises the following steps: laying a floor support plate; and the embedded part is installed above the floor support plate. And floor slab concrete is poured on the floor support plate. And after the floor concrete reaches the designed strength, the track is installed on the embedded part, the bottom elevation of the track is lower than the floor surface of the floor concrete, and the top elevation of the track is higher than the preset height of the floor surface of the floor concrete. And two sides of the track are poured and tamped. According to the construction method, the rail is arranged in a lower horizontal mode, and the use requirements that small machines can run conveniently and workers can walk on the working face conveniently during later production operation can be met under the condition that the manufacturing cost and the construction difficulty are reduced. According to the construction method, installation is convenient, the manufacturing cost is low, and the construction difficulty is greatly reduced.
本发明公开了一种变压器检修轨道结构施工方法,包括以下步骤:铺设楼承板。将预埋件安装在楼承板上方。在楼承板上浇筑楼板混凝土。待楼板混凝土达到设计强度后,将轨道安装在预埋件上,轨道的底标高低于楼板混凝土的楼板面,轨道的顶标高高出楼板混凝土的楼板面预设高度。将轨道两侧浇筑填实。本发明的施工方法使得轨道为下卧式设置,可在降低造价和施工难度的情况下,满足后期生产作业时小型机械行驶和工作人员行走作业面便利的使用要求。本发明的施工方法安装便利,造价较低,大大降低了施工难度。
Construction method of transformer maintenance track structure
The invention discloses a construction method of a transformer maintenance track structure. The construction method comprises the following steps: laying a floor support plate; and the embedded part is installed above the floor support plate. And floor slab concrete is poured on the floor support plate. And after the floor concrete reaches the designed strength, the track is installed on the embedded part, the bottom elevation of the track is lower than the floor surface of the floor concrete, and the top elevation of the track is higher than the preset height of the floor surface of the floor concrete. And two sides of the track are poured and tamped. According to the construction method, the rail is arranged in a lower horizontal mode, and the use requirements that small machines can run conveniently and workers can walk on the working face conveniently during later production operation can be met under the condition that the manufacturing cost and the construction difficulty are reduced. According to the construction method, installation is convenient, the manufacturing cost is low, and the construction difficulty is greatly reduced.
本发明公开了一种变压器检修轨道结构施工方法,包括以下步骤:铺设楼承板。将预埋件安装在楼承板上方。在楼承板上浇筑楼板混凝土。待楼板混凝土达到设计强度后,将轨道安装在预埋件上,轨道的底标高低于楼板混凝土的楼板面,轨道的顶标高高出楼板混凝土的楼板面预设高度。将轨道两侧浇筑填实。本发明的施工方法使得轨道为下卧式设置,可在降低造价和施工难度的情况下,满足后期生产作业时小型机械行驶和工作人员行走作业面便利的使用要求。本发明的施工方法安装便利,造价较低,大大降低了施工难度。
Construction method of transformer maintenance track structure
一种变压器检修轨道结构施工方法
ZHANG HAO (author) / MA RUJIAN (author) / ZHANG YONGBO (author) / LI HUAXING (author) / ZHANG ZELIN (author) / MA XUEKE (author)
2024-09-06
Patent
Electronic Resource
Chinese
Track construction and maintenance
Engineering Index Backfile | 1914
|Construction and Maintenance of Track
ASCE | 2021
|TRACK MAINTENANCE APPARATUS, TRACK MAINTENANCE SERVICE CAR AND TRACK MAINTENANCE METHOD
European Patent Office | 2020
|