Construction method of prefabricated rail top air duct
The invention discloses a construction method of a prefabricated rail top air duct, which can realize simultaneous construction of the prefabricated rail top air duct and a middle plate, strengthens the integrity of a structure, reduces the erection times of a bracket, realizes optimization of construction procedures, shortens the construction period and effectively reduces the cost. Through self-adaptive telescopic limiting, the pressure change value of the frame body can be monitored in real time after pre-pressing, early warning of risks such as instability of the frame body is achieved, and safe construction of a station structure is guaranteed; after segmented construction is completed, the device can integrally move in a segmented mode and directly enter the circulation of the next construction segment, and labor force and management cost are effectively saved.
本发明公开了一种预制轨顶风道的施工方法,其可实现预制轨顶风道与中板同时施工,加强了结构的整体性,同时减少了支架的搭设次数,实现了施工工序的优化,缩短了施工工期,有效降低成本;通过自适应伸缩限位,在预压后能实时监测架体压力变化值,实现架体失稳等风险预警,保证了车站结构的安全施工;本发明在分段施工完成后可分节整体移动,直接进入下一施工段的循环,有效节省了劳动力及管理成本。
Construction method of prefabricated rail top air duct
The invention discloses a construction method of a prefabricated rail top air duct, which can realize simultaneous construction of the prefabricated rail top air duct and a middle plate, strengthens the integrity of a structure, reduces the erection times of a bracket, realizes optimization of construction procedures, shortens the construction period and effectively reduces the cost. Through self-adaptive telescopic limiting, the pressure change value of the frame body can be monitored in real time after pre-pressing, early warning of risks such as instability of the frame body is achieved, and safe construction of a station structure is guaranteed; after segmented construction is completed, the device can integrally move in a segmented mode and directly enter the circulation of the next construction segment, and labor force and management cost are effectively saved.
本发明公开了一种预制轨顶风道的施工方法,其可实现预制轨顶风道与中板同时施工,加强了结构的整体性,同时减少了支架的搭设次数,实现了施工工序的优化,缩短了施工工期,有效降低成本;通过自适应伸缩限位,在预压后能实时监测架体压力变化值,实现架体失稳等风险预警,保证了车站结构的安全施工;本发明在分段施工完成后可分节整体移动,直接进入下一施工段的循环,有效节省了劳动力及管理成本。
Construction method of prefabricated rail top air duct
一种预制轨顶风道的施工方法
LIU YIHAO (author) / LIU JIARUI (author) / YOU GUANJUN (author) / TAN XIAOFENG (author) / YANG JIE (author) / YU JUN (author) / KANG ANSHUAI (author) / QUAN TAO (author) / YAN XINYU (author) / TAN ZHUQING (author)
2024-09-06
Patent
Electronic Resource
Chinese
IPC:
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E21D
SHAFTS
,
Schächte
European Patent Office | 2020
|European Patent Office | 2023
|Prefabricated cable duct bank and construction method thereof
European Patent Office | 2021
|Novel prefabricated rail top air duct suitable for subway station
European Patent Office | 2020
|