A platform for research: civil engineering, architecture and urbanism
Construction method of modular shear wall based on double-skin wall
The invention discloses a construction method of a modular shear wall based on a double-skin wall. The construction method comprises the steps that relevant parameter information is obtained; the size information of the adjusting gasket is calculated according to the obtained relevant parameter information; judging the relationship between the levelness of the installation site and the preset standard levelness, if the levelness of the installation site is greater than the preset standard levelness, outputting a first result, otherwise, outputting a second result; the first result is used for guiding a constructor to calibrate the levelness of the installation site by adjusting the adjusting gasket, and the second result is used for controlling a display to display the installation position and the design size of the shear wall and instructing the constructor to carry out construction according to display information of the display. According to the construction mode adopted by the invention, the intellectualization of the construction method can be realized, the analysis of related parameters and the calculation of corresponding results are more accurate, and the occurrence of errors possibly caused by manual calculation is avoided.
本发明公开了一种基于双皮墙的模块化剪力墙的施工方法,包括获取相关参数信息;根据获取到的相关参数信息来计算出所述调节垫片的尺寸信息;再判断所述安装现场的水平度与预设标准水平度之间的关系,若所述安装现场的水平度大于所述预设标准水平度,则输出第一结果,反之,则输出第二结果,所述第一结果用于指导施工人员通过调整所调节垫片来校准所述安装现场的水平度,所述第二结果用于控制显示器显示所述剪力墙的安装位置和设计尺寸,并指示施工人员根据显示器的显示信息进行施工。本发明采用的施工方式,可以实现施工方法的智能化,并且在分析相关参数和计算相应结果时更加准确,避免了通过人工进行计算可能出现误差的现象的出现。
Construction method of modular shear wall based on double-skin wall
The invention discloses a construction method of a modular shear wall based on a double-skin wall. The construction method comprises the steps that relevant parameter information is obtained; the size information of the adjusting gasket is calculated according to the obtained relevant parameter information; judging the relationship between the levelness of the installation site and the preset standard levelness, if the levelness of the installation site is greater than the preset standard levelness, outputting a first result, otherwise, outputting a second result; the first result is used for guiding a constructor to calibrate the levelness of the installation site by adjusting the adjusting gasket, and the second result is used for controlling a display to display the installation position and the design size of the shear wall and instructing the constructor to carry out construction according to display information of the display. According to the construction mode adopted by the invention, the intellectualization of the construction method can be realized, the analysis of related parameters and the calculation of corresponding results are more accurate, and the occurrence of errors possibly caused by manual calculation is avoided.
本发明公开了一种基于双皮墙的模块化剪力墙的施工方法,包括获取相关参数信息;根据获取到的相关参数信息来计算出所述调节垫片的尺寸信息;再判断所述安装现场的水平度与预设标准水平度之间的关系,若所述安装现场的水平度大于所述预设标准水平度,则输出第一结果,反之,则输出第二结果,所述第一结果用于指导施工人员通过调整所调节垫片来校准所述安装现场的水平度,所述第二结果用于控制显示器显示所述剪力墙的安装位置和设计尺寸,并指示施工人员根据显示器的显示信息进行施工。本发明采用的施工方式,可以实现施工方法的智能化,并且在分析相关参数和计算相应结果时更加准确,避免了通过人工进行计算可能出现误差的现象的出现。
Construction method of modular shear wall based on double-skin wall
一种基于双皮墙的模块化剪力墙的施工方法
HUANG CHENGUANG (author) / GUI ZHENGRONG (author) / LIANG YUDE (author) / LIN CHUNJIAN (author) / ZHANG ZAICHEN (author) / HUANG YINGJIAN (author)
2024-09-10
Patent
Electronic Resource
Chinese
Concrete modular shear wall and construction method thereof
European Patent Office | 2024
|Modular shear wall structure and construction method thereof
European Patent Office | 2023
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
European Patent Office | 2021
|Shear wall construction method, building construction method, shear wall and building
European Patent Office | 2020
|