Sponge road construction method
The invention relates to the technical field of sponge roads, and discloses a sponge road construction method which comprises the following construction steps: 1) cleaning a construction foundation; (2) a constraint structure is laid on the construction foundation, a plurality of constraint cells are arranged in the constraint structure, and constraint walls are formed on the peripheries of the constraint cells in a surrounding mode; 3) paving graded broken stone on the construction foundation to form a bearing layer; (4) the bearing layer is rolled through road rolling equipment; (5) emulsified asphalt is sprayed on the bearing layer, and an adhesion layer is formed; (6) asphalt materials are laid on the adhesion layer, an asphalt surface layer is formed, and the asphalt surface layer, the adhesion layer and the bearing layer form the sponge road of an integrated structure; the restraining walls can provide lateral restraining for the graded broken stone materials, the restraining cells can reduce deformation of the graded broken stone materials and deformation of the bearing layer, the bearing layer can store and permeate water, and the characteristics of the sponge road are embodied.
本发明涉及海绵道路的技术领域,公开了海绵道路施工方法,包括以下施工步骤:1)、清理施工地基;2)、在施工地基上铺设约束结构,约束结构中具有多个约束格室,约束格室的外周包围形成有约束壁;3)、在施工地基上摊铺级配碎石料,形成承载层;4)、通过压路设备碾压承载层;5)、在承载层上喷洒乳化沥青,形成粘附层;6)、在粘附层上摊铺沥青料,形成沥青面层,沥青面层、粘附层以及承载层形成一体结构的海绵道路;约束壁可以给级配碎石料提供侧向约束,约束格室可以减少级配碎石料的变形,减少承载层的变形,承载层可以蓄水透水,体现海绵道路的特点。
Sponge road construction method
The invention relates to the technical field of sponge roads, and discloses a sponge road construction method which comprises the following construction steps: 1) cleaning a construction foundation; (2) a constraint structure is laid on the construction foundation, a plurality of constraint cells are arranged in the constraint structure, and constraint walls are formed on the peripheries of the constraint cells in a surrounding mode; 3) paving graded broken stone on the construction foundation to form a bearing layer; (4) the bearing layer is rolled through road rolling equipment; (5) emulsified asphalt is sprayed on the bearing layer, and an adhesion layer is formed; (6) asphalt materials are laid on the adhesion layer, an asphalt surface layer is formed, and the asphalt surface layer, the adhesion layer and the bearing layer form the sponge road of an integrated structure; the restraining walls can provide lateral restraining for the graded broken stone materials, the restraining cells can reduce deformation of the graded broken stone materials and deformation of the bearing layer, the bearing layer can store and permeate water, and the characteristics of the sponge road are embodied.
本发明涉及海绵道路的技术领域,公开了海绵道路施工方法,包括以下施工步骤:1)、清理施工地基;2)、在施工地基上铺设约束结构,约束结构中具有多个约束格室,约束格室的外周包围形成有约束壁;3)、在施工地基上摊铺级配碎石料,形成承载层;4)、通过压路设备碾压承载层;5)、在承载层上喷洒乳化沥青,形成粘附层;6)、在粘附层上摊铺沥青料,形成沥青面层,沥青面层、粘附层以及承载层形成一体结构的海绵道路;约束壁可以给级配碎石料提供侧向约束,约束格室可以减少级配碎石料的变形,减少承载层的变形,承载层可以蓄水透水,体现海绵道路的特点。
Sponge road construction method
海绵道路施工方法
WEI DEHUI (author) / CHEN YONGJIN (author) / ZHOU HAITING (author)
2024-09-17
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Anti-sinking sponge urban road, mold and construction method of anti-sinking sponge urban road
European Patent Office | 2024
|European Patent Office | 2022
|