A platform for research: civil engineering, architecture and urbanism
Construction method of double-layer surrounding straight curve mixed automobile ramp
The invention discloses a construction method of a double-layer surrounding straight curve mixed automobile ramp, which comprises the following steps: S1, performing arc slope measurement informatization paying-off: performing modeling on the double-layer surrounding straight curve mixed ramp by utilizing a BIM technology, and completing ramp coordinate positioning and elevation paying-off by utilizing an RTK (Real Time Kinematic) measuring instrument; s2, construction of an arc-shaped wall formwork of the automobile ramp is conducted, specifically, modeling is conducted on a double-layer ramp outer wall through the BIM technology, the double-layer ramp outer wall is decomposed into a plurality of unit blocks according to the structural shape of the arc-shaped ramp, and formwork matching plate design is conducted on each unit block; s3, performing concrete construction on the double-layer surrounding straight curve ramp structure: dividing a water flowing section of the double-layer surrounding straight curve ramp structure, and determining a pouring sequence of horizontal and vertical structures of each section; and S4, the BIM model is used for simulating arrangement of pipelines and spraying pipes, so that the clear height of the ramp driving route position meets the design requirement.
本发明公开了一种双层环绕直曲线混合汽车坡道施工方法,包括如下步骤:S1、弧坡测量信息化放线:利用BIM技术对双层环绕直曲线混合坡道进行建模,并利用RTK测量仪完成坡道坐标定位和标高放线;S2、汽车坡道弧形墙模板施工:利用BIM技术对双层坡道外墙进行建模,根据弧形坡道结构形状,将双层坡道外墙分解为若干个单元块体,并对每个单元块体进行模板配板设计;S3、双层环绕直曲线坡道结构混凝土施工:对双层环绕直曲线坡道结构流水段进行划分,并确定各段水平和竖向结构的浇筑顺序;S4、利用BIM模型对管线和喷淋管的排布进行模拟,使坡道行车路线位置净高满足设计要求。
Construction method of double-layer surrounding straight curve mixed automobile ramp
The invention discloses a construction method of a double-layer surrounding straight curve mixed automobile ramp, which comprises the following steps: S1, performing arc slope measurement informatization paying-off: performing modeling on the double-layer surrounding straight curve mixed ramp by utilizing a BIM technology, and completing ramp coordinate positioning and elevation paying-off by utilizing an RTK (Real Time Kinematic) measuring instrument; s2, construction of an arc-shaped wall formwork of the automobile ramp is conducted, specifically, modeling is conducted on a double-layer ramp outer wall through the BIM technology, the double-layer ramp outer wall is decomposed into a plurality of unit blocks according to the structural shape of the arc-shaped ramp, and formwork matching plate design is conducted on each unit block; s3, performing concrete construction on the double-layer surrounding straight curve ramp structure: dividing a water flowing section of the double-layer surrounding straight curve ramp structure, and determining a pouring sequence of horizontal and vertical structures of each section; and S4, the BIM model is used for simulating arrangement of pipelines and spraying pipes, so that the clear height of the ramp driving route position meets the design requirement.
本发明公开了一种双层环绕直曲线混合汽车坡道施工方法,包括如下步骤:S1、弧坡测量信息化放线:利用BIM技术对双层环绕直曲线混合坡道进行建模,并利用RTK测量仪完成坡道坐标定位和标高放线;S2、汽车坡道弧形墙模板施工:利用BIM技术对双层坡道外墙进行建模,根据弧形坡道结构形状,将双层坡道外墙分解为若干个单元块体,并对每个单元块体进行模板配板设计;S3、双层环绕直曲线坡道结构混凝土施工:对双层环绕直曲线坡道结构流水段进行划分,并确定各段水平和竖向结构的浇筑顺序;S4、利用BIM模型对管线和喷淋管的排布进行模拟,使坡道行车路线位置净高满足设计要求。
Construction method of double-layer surrounding straight curve mixed automobile ramp
一种双层环绕直曲线混合汽车坡道施工方法
PING JIFEI (author) / ZHOU HAO (author) / XU DELIN (author) / YANG XINQIANG (author) / BAI JINHE (author) / ZHANG TONG (author) / XIANG PAN (author) / CHENG XU (author) / HE PENGYUAN (author) / YAN JIE (author)
2024-09-17
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E04G
SCAFFOLDING
,
Baugerüste
Straight-curve universal wall formwork system and straight-curve universal wall construction method
European Patent Office | 2023
|Construction technology of assembly type automobile ramp
European Patent Office | 2022
|Incremental launching construction method for curve steel box girder ramp bridge
European Patent Office | 2023
|Intelligent garage and automobile ramp dismounting and replacing support construction method
European Patent Office | 2024
|Large-tonnage box beam erecting construction method for small-radius curve ramp
European Patent Office | 2022
|