A platform for research: civil engineering, architecture and urbanism
Correcting process suitable for torsion, inclination and settlement of building
The invention discloses a correction technology suitable for torsion, inclination and settlement of a building, and belongs to the technical field of building repair. The correction technology comprises the following steps that 1, ground excavation and foundation arrangement are conducted; 2, performing indoor and outdoor pile pressing operation; 3, stand column pretreatment and jacking bearing platform construction; step 4, mounting a jacking mechanism and performing column breaking operation; 5, jacking correction treatment is carried out; step 6, torsion correction treatment; 7, reinforcing steel bar restoration and high-strength grouting material restoration; and 8, the torsion mechanism is dismantled, and the jacking bearing platform is cleaned. Through ground excavation and foundation arrangement, the foundation structure of the to-be-corrected building is optimized, the structural stability of the to-be-corrected building is improved, and the situation that the to-be-corrected building is integrally deformed due to uneven settlement again is avoided; and the special torsion mechanism is arranged, so that the building subjected to overall torsion deformation can be effectively corrected, secondary damage to the building in the torsion repair process is avoided, and the original structure of the building to be corrected is protected to the maximum extent.
本发明公开了一种适用于建筑物扭转、倾斜、沉降的矫正工艺,属于建筑物修复技术领域,包括如下步骤:步骤1、地面开挖与基础布置;步骤2、室内外压桩作业;步骤3、立柱预处理与顶升承台构建;步骤4、安装顶升机构与断柱操作;步骤5、顶升矫正处理;步骤6、扭转矫正处理;步骤7、钢筋复原与高强灌浆料修复;步骤8、拆除扭转机构与清理顶升承台。本发明通过地面开挖与基础布置,优化待矫正建筑物的地基结构,提高了其结构稳定性,避免待矫正建筑物再次因不均匀沉降而出现整体变形等状况;设置专用扭转机构,便于对整体扭转变形的建筑物进行有效矫正,避免在扭转修复过程中对建筑物造成二次破坏,最大限度的保护待矫正建筑物的原始构造。
Correcting process suitable for torsion, inclination and settlement of building
The invention discloses a correction technology suitable for torsion, inclination and settlement of a building, and belongs to the technical field of building repair. The correction technology comprises the following steps that 1, ground excavation and foundation arrangement are conducted; 2, performing indoor and outdoor pile pressing operation; 3, stand column pretreatment and jacking bearing platform construction; step 4, mounting a jacking mechanism and performing column breaking operation; 5, jacking correction treatment is carried out; step 6, torsion correction treatment; 7, reinforcing steel bar restoration and high-strength grouting material restoration; and 8, the torsion mechanism is dismantled, and the jacking bearing platform is cleaned. Through ground excavation and foundation arrangement, the foundation structure of the to-be-corrected building is optimized, the structural stability of the to-be-corrected building is improved, and the situation that the to-be-corrected building is integrally deformed due to uneven settlement again is avoided; and the special torsion mechanism is arranged, so that the building subjected to overall torsion deformation can be effectively corrected, secondary damage to the building in the torsion repair process is avoided, and the original structure of the building to be corrected is protected to the maximum extent.
本发明公开了一种适用于建筑物扭转、倾斜、沉降的矫正工艺,属于建筑物修复技术领域,包括如下步骤:步骤1、地面开挖与基础布置;步骤2、室内外压桩作业;步骤3、立柱预处理与顶升承台构建;步骤4、安装顶升机构与断柱操作;步骤5、顶升矫正处理;步骤6、扭转矫正处理;步骤7、钢筋复原与高强灌浆料修复;步骤8、拆除扭转机构与清理顶升承台。本发明通过地面开挖与基础布置,优化待矫正建筑物的地基结构,提高了其结构稳定性,避免待矫正建筑物再次因不均匀沉降而出现整体变形等状况;设置专用扭转机构,便于对整体扭转变形的建筑物进行有效矫正,避免在扭转修复过程中对建筑物造成二次破坏,最大限度的保护待矫正建筑物的原始构造。
Correcting process suitable for torsion, inclination and settlement of building
一种适用于建筑物扭转、倾斜、沉降的矫正工艺
ZHU RONG (author) / LIU YONG (author) / FANG YAN (author) / ZHANG LIUQING (author)
2024-09-27
Patent
Electronic Resource
Chinese
Building inclination correcting structure and processing method
European Patent Office | 2020
|Compaction grouting for correcting building settlement
British Library Conference Proceedings | 1996
|Frame structure building pile foundation support inclination correcting method
European Patent Office | 2021
|Engineering Illustrations of Correcting Building Inclination by Stress 1.34
British Library Conference Proceedings | 1993
|