A platform for research: civil engineering, architecture and urbanism
Large-span concrete wall secondary repair leveling forming device and construction method thereof
The invention discloses a large-span concrete wall secondary repair leveling forming device and a construction method thereof.The large-span concrete wall secondary repair leveling forming device comprises two clamping plates, an end sealing plate is supported between the ends of the two clamping plates, a pouring space is defined by the two clamping plates, the end sealing plate and a wall head, and a plurality of sliding grooves are formed in the opposite sides of the two clamping plates; each locking structure comprises two moving plates, the two moving plates are attached to the opposite sides of the two clamping plates respectively, rolling wheels are installed on the moving plates, the rolling wheels are arranged in one sliding groove in a sliding mode, locking pieces used for pressing and abutting against the opposite sides of the clamping plates are detachably installed on the moving plates, the locking pieces are arranged in the other sliding groove, and the locking pieces are connected with the clamping plates in a sliding mode. A supporting plate with the adjustable length is connected between the two movable plates. The scraping plate is mounted on the supporting plate and is embedded between the upper parts of the two clamping plates; and a vibrator mounted on the support plate. The problem that an existing construction method for secondary repairing of the concrete wall is difficult to reinforce is solved.
本发明公开了一种大跨度混凝土墙二次修补找平成型装置及其施工方法,包括:两个夹持板,两个夹持板的端部之间支撑有封端板,两个夹持板与封端板、墙头之间围合形成浇筑空间,两个夹持板的相背侧开设有多条滑槽;至少三个锁合结构,锁合结构包括两个移动板,两个移动板分别贴合于两个夹持板的相背侧,移动板上安装有滚轮,滚轮滑设于一个滑槽中,移动板上可拆卸地安装有用于压抵夹持板的相背侧的锁定件,锁定件设置于另一个滑槽中,两个移动板之间连接有长度可调的支承板;刮平板,安装于支承板且嵌设于两个夹持板的上部之间;振动器,安装于支承板。本发明解决了混凝土墙的二次修补的现有施工方法存在加固困难的问题。
Large-span concrete wall secondary repair leveling forming device and construction method thereof
The invention discloses a large-span concrete wall secondary repair leveling forming device and a construction method thereof.The large-span concrete wall secondary repair leveling forming device comprises two clamping plates, an end sealing plate is supported between the ends of the two clamping plates, a pouring space is defined by the two clamping plates, the end sealing plate and a wall head, and a plurality of sliding grooves are formed in the opposite sides of the two clamping plates; each locking structure comprises two moving plates, the two moving plates are attached to the opposite sides of the two clamping plates respectively, rolling wheels are installed on the moving plates, the rolling wheels are arranged in one sliding groove in a sliding mode, locking pieces used for pressing and abutting against the opposite sides of the clamping plates are detachably installed on the moving plates, the locking pieces are arranged in the other sliding groove, and the locking pieces are connected with the clamping plates in a sliding mode. A supporting plate with the adjustable length is connected between the two movable plates. The scraping plate is mounted on the supporting plate and is embedded between the upper parts of the two clamping plates; and a vibrator mounted on the support plate. The problem that an existing construction method for secondary repairing of the concrete wall is difficult to reinforce is solved.
本发明公开了一种大跨度混凝土墙二次修补找平成型装置及其施工方法,包括:两个夹持板,两个夹持板的端部之间支撑有封端板,两个夹持板与封端板、墙头之间围合形成浇筑空间,两个夹持板的相背侧开设有多条滑槽;至少三个锁合结构,锁合结构包括两个移动板,两个移动板分别贴合于两个夹持板的相背侧,移动板上安装有滚轮,滚轮滑设于一个滑槽中,移动板上可拆卸地安装有用于压抵夹持板的相背侧的锁定件,锁定件设置于另一个滑槽中,两个移动板之间连接有长度可调的支承板;刮平板,安装于支承板且嵌设于两个夹持板的上部之间;振动器,安装于支承板。本发明解决了混凝土墙的二次修补的现有施工方法存在加固困难的问题。
Large-span concrete wall secondary repair leveling forming device and construction method thereof
大跨度混凝土墙二次修补找平成型装置及其施工方法
YAO XUAN (author) / HOU HANBIN (author) / XU GUODONG (author) / SHI SUDONG (author) / GAO YUNHENG (author) / HU ZHIXU (author) / WANG MINGXIANG (author) / CAO XUECHENG (author) / WANG PENGFEI (author) / ZHU FANG (author)
2024-09-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Roof concrete leveling device for large-span weather playground construction
European Patent Office | 2024
|Concrete wall surface leveling device for building construction
European Patent Office | 2024
|large-span equipment frame foundation leveling and assembling construction device and method
European Patent Office | 2021
|Construction method of large-span thin-wall concrete sound barrier
European Patent Office | 2021
|