A platform for research: civil engineering, architecture and urbanism
Ship lift lock head water retaining method suitable for ship lift channel water level rising greatly
A ship lift lock head water retaining method suitable for the situation that the water level of a ship lift channel rises greatly comprises the following steps that firstly, rising of the water level is detected, and it is judged that a section of working stop log door is added; (2) the maintenance gate falls into a maintenance gate groove for water retaining; (3) water between the working door and the access door is drained; (4) the working gate is lifted to a working gate buttress; (5) the working stoplog gate is lifted into a working gate groove; (6) the working gate is lifted to fall into a working gate groove; (7) the overhaul door is lifted, and channel water is filled between the working door and the overhaul door; the overhaul gate is lifted to the overhaul gate buttress; according to the ship lift lock head water retaining method suitable for the ship lift channel water level rising greatly, the ship lift lock head water retaining method suitable for the ship lift channel water level rising greatly can adapt to channel water level change greatly, and the door position adjusting workload can be reduced.
一种适用升船机航道水位大幅上涨时的升船机闸首挡水方法,包括以下步骤:步骤1):检测水位上涨,判断通过增加一节工作叠梁门;步骤2):将检修大门落放至检修门槽挡水;步骤3):泄掉工作门、检修门之间的水体;步骤4):将工作大门提升至工作大门支墩上;步骤5):提升工作叠梁门到工作门槽内;步骤6):提升工作大门落放至工作门槽;步骤7):提升检修大门,航道水充至工作门和检修门之间;提升检修大门至检修大门支墩上;步骤8):提升一节检修叠梁门落放至检修门槽;步骤9):检修门启闭机对检修大门拉紧,挡水高度增大完成。本发明提供的一种适用升船机航道水位大幅上涨时的升船机闸首挡水方法,能适应大幅度航道水位变化,有利于减少门位调整工作量。
Ship lift lock head water retaining method suitable for ship lift channel water level rising greatly
A ship lift lock head water retaining method suitable for the situation that the water level of a ship lift channel rises greatly comprises the following steps that firstly, rising of the water level is detected, and it is judged that a section of working stop log door is added; (2) the maintenance gate falls into a maintenance gate groove for water retaining; (3) water between the working door and the access door is drained; (4) the working gate is lifted to a working gate buttress; (5) the working stoplog gate is lifted into a working gate groove; (6) the working gate is lifted to fall into a working gate groove; (7) the overhaul door is lifted, and channel water is filled between the working door and the overhaul door; the overhaul gate is lifted to the overhaul gate buttress; according to the ship lift lock head water retaining method suitable for the ship lift channel water level rising greatly, the ship lift lock head water retaining method suitable for the ship lift channel water level rising greatly can adapt to channel water level change greatly, and the door position adjusting workload can be reduced.
一种适用升船机航道水位大幅上涨时的升船机闸首挡水方法,包括以下步骤:步骤1):检测水位上涨,判断通过增加一节工作叠梁门;步骤2):将检修大门落放至检修门槽挡水;步骤3):泄掉工作门、检修门之间的水体;步骤4):将工作大门提升至工作大门支墩上;步骤5):提升工作叠梁门到工作门槽内;步骤6):提升工作大门落放至工作门槽;步骤7):提升检修大门,航道水充至工作门和检修门之间;提升检修大门至检修大门支墩上;步骤8):提升一节检修叠梁门落放至检修门槽;步骤9):检修门启闭机对检修大门拉紧,挡水高度增大完成。本发明提供的一种适用升船机航道水位大幅上涨时的升船机闸首挡水方法,能适应大幅度航道水位变化,有利于减少门位调整工作量。
Ship lift lock head water retaining method suitable for ship lift channel water level rising greatly
一种适用升船机航道水位大幅上涨时的升船机闸首挡水方法
ZHOU ENJIANG (author) / ZHENG WEILI (author) / HUANG XIAOHUAN (author) / XU GANG (author) / XIAO QIAN (author) / ZHANG YINTING (author) / CAI QIQI (author) / GONG HAODONG (author) / CHEN YUE (author) / DENG ZHIQIANG (author)
2024-10-01
Patent
Electronic Resource
Chinese
Ship lift lock head water retaining method suitable for ship lift channel water level fluctuation
European Patent Office | 2024
|Lock head water retaining system suitable for great change of water level of ship lift channel
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2023
|