A platform for research: civil engineering, architecture and urbanism
Dehydration system for mucky clay soft roadbed
The invention discloses a dehydration system for a mucky clay soft roadbed, and relates to the technical field of road construction, the dehydration system comprises a vacuum preloading part, a data acquisition unit and a monitoring control unit, the vacuum preloading part is provided with a drainage channel, a sand cushion layer, a sealing film and a vacuum pump, the data acquisition unit is provided with a soil moisture sensor, a pressure sensor and a force sensor. The monitoring control unit is provided with a processing module and an alarm module. By arranging the drainage channel, the sand cushion layer, the sealing film, the vacuum pump, the data acquisition unit and the monitoring control unit, real-time monitoring and accurate control of soft roadbed dehydration are achieved, the reinforcing effect of the soft roadbed is improved, the construction period is shortened, the cost is reduced, the influence on the surrounding environment is reduced, and the safety of the soft roadbed is improved. And the method has remarkable economic and social benefits.
本发明公开了一种用于淤泥质黏土软路基的脱水系统,涉及到道路施工技术领域,包括真空预压部、数据采集单元以及监测控制单元,真空预压部具有排水通道、砂垫层、密封膜以及真空泵,数据采集单元具有土壤水分传感器、压力传感器以及力传感器,监测控制单元具有处理模块与报警模块。通过设置排水通道、砂垫层、密封膜与真空泵,以及数据采集单元和监测控制单元,实现了对软路基脱水的实时监测和精确控制,不仅提高了软路基的加固效果,还缩短了施工周期,降低了成本,减少了对周边环境的影响,具有显著的经济和社会效益。
Dehydration system for mucky clay soft roadbed
The invention discloses a dehydration system for a mucky clay soft roadbed, and relates to the technical field of road construction, the dehydration system comprises a vacuum preloading part, a data acquisition unit and a monitoring control unit, the vacuum preloading part is provided with a drainage channel, a sand cushion layer, a sealing film and a vacuum pump, the data acquisition unit is provided with a soil moisture sensor, a pressure sensor and a force sensor. The monitoring control unit is provided with a processing module and an alarm module. By arranging the drainage channel, the sand cushion layer, the sealing film, the vacuum pump, the data acquisition unit and the monitoring control unit, real-time monitoring and accurate control of soft roadbed dehydration are achieved, the reinforcing effect of the soft roadbed is improved, the construction period is shortened, the cost is reduced, the influence on the surrounding environment is reduced, and the safety of the soft roadbed is improved. And the method has remarkable economic and social benefits.
本发明公开了一种用于淤泥质黏土软路基的脱水系统,涉及到道路施工技术领域,包括真空预压部、数据采集单元以及监测控制单元,真空预压部具有排水通道、砂垫层、密封膜以及真空泵,数据采集单元具有土壤水分传感器、压力传感器以及力传感器,监测控制单元具有处理模块与报警模块。通过设置排水通道、砂垫层、密封膜与真空泵,以及数据采集单元和监测控制单元,实现了对软路基脱水的实时监测和精确控制,不仅提高了软路基的加固效果,还缩短了施工周期,降低了成本,减少了对周边环境的影响,具有显著的经济和社会效益。
Dehydration system for mucky clay soft roadbed
一种用于淤泥质黏土软路基的脱水系统
ZHAO DESHENG (author) / LEE SANG HOO (author) / HEIYANG HEIYANG (author) / SUN YUNQIAO (author) / SUN RUNZE (author) / WU WEI (author) / ZHANG SHIXING (author) / SHI YINHUI (author)
2024-10-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
G08B
SIGNALLING OR CALLING SYSTEMS
,
Signalisier- oder Rufsysteme
Production process for solidifying and regenerating roadbed filler by using mucky muck
European Patent Office | 2021
|Mucky soil dehydration device vehicle and using method thereof
European Patent Office | 2020
|Construction method for mucky soft soil roadbase tubular pile
European Patent Office | 2015
|Six-foot sewer built on Mucky soil
Engineering Index Backfile | 1948