Tower column cross beam construction method
The invention discloses a tower column cross beam construction method, which is characterized in that each cross beam is sequentially constructed on a tower column from top to bottom, and in the construction process, the same cross beam bracket is sequentially put down to serve as a pressure-bearing foundation for pouring each cross beam. According to the invention, one cross beam bracket is shared in the construction of the plurality of cross beams on the tower column, and the cross beam bracket does not need to be repeatedly assembled and disassembled, so that the time for assembling and disassembling the cross beam bracket is effectively reduced, the overall construction period of the plurality of cross beams is shortened, and meanwhile, the aloft work amount is reduced; the construction efficiency is effectively improved; and the construction safety is improved.
本发明公开了塔柱横梁施工方法,所述施工方法从上至下在塔柱上依次进行各道横梁的施工,施工过程中将同一横梁托架依次下放作为浇筑各道横梁的承压基础。本发明在塔柱上多道横梁的施工中共用一个横梁托架,不需要对横梁托架进行重复组装和拆卸,从而有效减少了横梁托架自身安装和拆卸的时间,缩短了多道横梁的整体施工周期的同时减小了高空作业量,有效提高了施工效率并提高了施工的安全性。
Tower column cross beam construction method
The invention discloses a tower column cross beam construction method, which is characterized in that each cross beam is sequentially constructed on a tower column from top to bottom, and in the construction process, the same cross beam bracket is sequentially put down to serve as a pressure-bearing foundation for pouring each cross beam. According to the invention, one cross beam bracket is shared in the construction of the plurality of cross beams on the tower column, and the cross beam bracket does not need to be repeatedly assembled and disassembled, so that the time for assembling and disassembling the cross beam bracket is effectively reduced, the overall construction period of the plurality of cross beams is shortened, and meanwhile, the aloft work amount is reduced; the construction efficiency is effectively improved; and the construction safety is improved.
本发明公开了塔柱横梁施工方法,所述施工方法从上至下在塔柱上依次进行各道横梁的施工,施工过程中将同一横梁托架依次下放作为浇筑各道横梁的承压基础。本发明在塔柱上多道横梁的施工中共用一个横梁托架,不需要对横梁托架进行重复组装和拆卸,从而有效减少了横梁托架自身安装和拆卸的时间,缩短了多道横梁的整体施工周期的同时减小了高空作业量,有效提高了施工效率并提高了施工的安全性。
Tower column cross beam construction method
塔柱横梁施工方法
YI SHOUWEI (author) / HUANG YIMEI (author) / ZHANG FAPING (author) / ZHOU ZELIN (author) / ZHU LEI (author) / GUO WENXIN (author) / ZHOU YINGCHAO (author) / CHEN RUI (author) / WEI CHENGYI (author)
2024-10-11
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Tower column cross beam support overall lowering construction method
European Patent Office | 2021
|European Patent Office | 2024
|Construction method of upper cross beam of tower column steel pipe truss
European Patent Office | 2024
|