Construction formwork for bridge construction joint
The invention relates to the technical field of construction formworks, and discloses a construction formwork for bridge construction seaming, which comprises a mounting platform and further comprises a lower formwork, a liftable formwork is mounted on the mounting platform, an upper formwork fixing mechanism is mounted on the formwork, an upper formwork is mounted on the upper formwork fixing mechanism, a first winding mechanism is mounted on the formwork, and a second winding mechanism is mounted on the lower formwork. Two fixing blocks are installed in the middle of the lower die plate, first connecting pieces connected with the first winding mechanism are installed on the two fixing blocks, and two lead screw transmission modules arranged in a mirror image mode are installed on the die frame. When the construction formwork is used, automatic combination and separation of the lower formwork and a hoisting mechanism can be achieved, rapid transposition or corner type moving-out, recycling and seam penetrating arrangement of the lower formwork on a bridge joint are achieved, and then the arrangement efficiency and the recycling efficiency of the construction formwork are effectively improved.
本发明涉及施工模板技术领域,且公开了一种桥梁施工接缝用施工模板,包括挂载平台,还包括下模板,挂载平台上安装有可升降的模架,模架上安装有上模固定机构,上模固定机构上安装有上模板,模架上安装有第一卷绕机构,下模板的中部安装有两个固定块,两个固定块上均安装有与第一卷绕机构连接的第一连接件,模架上安装有两个镜像设置的丝杆传动模块。本施工模板使用时能够实现下模板与吊装机构的自动结合与脱离,并实现下模板由桥梁接缝上的快速转位或转角式移出、回收及穿缝布设,继而有效提升施工模板的布设效率及回收效率。
Construction formwork for bridge construction joint
The invention relates to the technical field of construction formworks, and discloses a construction formwork for bridge construction seaming, which comprises a mounting platform and further comprises a lower formwork, a liftable formwork is mounted on the mounting platform, an upper formwork fixing mechanism is mounted on the formwork, an upper formwork is mounted on the upper formwork fixing mechanism, a first winding mechanism is mounted on the formwork, and a second winding mechanism is mounted on the lower formwork. Two fixing blocks are installed in the middle of the lower die plate, first connecting pieces connected with the first winding mechanism are installed on the two fixing blocks, and two lead screw transmission modules arranged in a mirror image mode are installed on the die frame. When the construction formwork is used, automatic combination and separation of the lower formwork and a hoisting mechanism can be achieved, rapid transposition or corner type moving-out, recycling and seam penetrating arrangement of the lower formwork on a bridge joint are achieved, and then the arrangement efficiency and the recycling efficiency of the construction formwork are effectively improved.
本发明涉及施工模板技术领域,且公开了一种桥梁施工接缝用施工模板,包括挂载平台,还包括下模板,挂载平台上安装有可升降的模架,模架上安装有上模固定机构,上模固定机构上安装有上模板,模架上安装有第一卷绕机构,下模板的中部安装有两个固定块,两个固定块上均安装有与第一卷绕机构连接的第一连接件,模架上安装有两个镜像设置的丝杆传动模块。本施工模板使用时能够实现下模板与吊装机构的自动结合与脱离,并实现下模板由桥梁接缝上的快速转位或转角式移出、回收及穿缝布设,继而有效提升施工模板的布设效率及回收效率。
Construction formwork for bridge construction joint
一种桥梁施工接缝用施工模板
WANG FANG (author) / LI ZHENGWEI (author) / YE ZHIQIU (author) / LIU YONG (author) / LI RUI (author)
2024-10-11
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Formwork and construction method for bridge formwork turnover pier column construction
European Patent Office | 2023
|Bridge wet joint formwork system and construction method thereof
European Patent Office | 2022
|Arched support, arch bridge formwork and arch bridge formwork construction method
European Patent Office | 2023
|Formwork, formwork unit and construction method for building convex joint construction
European Patent Office | 2024
|Bridge deck slab joint with UHPC formwork and construction method
European Patent Office | 2023
|