A platform for research: civil engineering, architecture and urbanism
Double-line water-saving ship lock head gooseneck gallery construction system and method
The invention relates to the technical field of gallery construction, in particular to a lock head gooseneck gallery construction system and method.The gooseneck gallery construction system comprises a formwork structure installed on the construction ground, and the lower portion of the plane section of an outer formwork structure is supported on the upper portion of an inner formwork structure through a plane supporting frame; the lower portion of the cambered surface section of the outer formwork structure is supported above the inner formwork structure through a cambered surface supporting frame, a special-shaped formwork box is arranged in the position, above the cambered surface supporting frame, of the outer formwork structure, and adjustable supporting assemblies are installed on the outer formwork structure and the inner formwork structure. A multi-layer pouring mode is used, the formwork is built and fixed while pouring is conducted, and the formwork stability is good; the adjustable supporting assembly is used, the angle can be adjusted according to the angle requirements of different use positions, and formwork building is facilitated; and a retaining structure is designed, so that the adjusting handle can only be rotated and adjusted in one direction and can be automatically locked, and thread loosening caused by impact or vibration in the pouring process is prevented.
本发明涉及廊道施工技术领域,具体涉及双线省水船闸上闸首鹅颈廊道施工系统及方法,鹅颈廊道的施工系统包含安装于施工地面的模板结构,外模板结构的平面段处下方通过平面支撑架支撑于内模板结构上方,外模板结构的弧面段下方通过弧面支撑架支撑于内模板结构上方,弧面支撑架上方的外模板结构中设有异形模板盒,外模板结构和内模板结构上均安装有可调式支撑组件;使用多层浇筑的方式,在浇筑的同时进行模板的搭建和固定,模板稳定性好;使用可调节的可调式支撑组件,可以根据不同使用位置的角度需求调节角度,方便模板搭建;设计止退结构,使得调节把只能单向转动调节,可以自动锁定,防止浇筑过程中由于冲击或是振动导致螺纹松动。
Double-line water-saving ship lock head gooseneck gallery construction system and method
The invention relates to the technical field of gallery construction, in particular to a lock head gooseneck gallery construction system and method.The gooseneck gallery construction system comprises a formwork structure installed on the construction ground, and the lower portion of the plane section of an outer formwork structure is supported on the upper portion of an inner formwork structure through a plane supporting frame; the lower portion of the cambered surface section of the outer formwork structure is supported above the inner formwork structure through a cambered surface supporting frame, a special-shaped formwork box is arranged in the position, above the cambered surface supporting frame, of the outer formwork structure, and adjustable supporting assemblies are installed on the outer formwork structure and the inner formwork structure. A multi-layer pouring mode is used, the formwork is built and fixed while pouring is conducted, and the formwork stability is good; the adjustable supporting assembly is used, the angle can be adjusted according to the angle requirements of different use positions, and formwork building is facilitated; and a retaining structure is designed, so that the adjusting handle can only be rotated and adjusted in one direction and can be automatically locked, and thread loosening caused by impact or vibration in the pouring process is prevented.
本发明涉及廊道施工技术领域,具体涉及双线省水船闸上闸首鹅颈廊道施工系统及方法,鹅颈廊道的施工系统包含安装于施工地面的模板结构,外模板结构的平面段处下方通过平面支撑架支撑于内模板结构上方,外模板结构的弧面段下方通过弧面支撑架支撑于内模板结构上方,弧面支撑架上方的外模板结构中设有异形模板盒,外模板结构和内模板结构上均安装有可调式支撑组件;使用多层浇筑的方式,在浇筑的同时进行模板的搭建和固定,模板稳定性好;使用可调节的可调式支撑组件,可以根据不同使用位置的角度需求调节角度,方便模板搭建;设计止退结构,使得调节把只能单向转动调节,可以自动锁定,防止浇筑过程中由于冲击或是振动导致螺纹松动。
Double-line water-saving ship lock head gooseneck gallery construction system and method
双线省水船闸上闸首鹅颈廊道施工系统及方法
WU FENGLIANG (author) / AN XIUSHAN (author) / HAN ZHENXIANG (author) / LI LIANG (author) / LIU MING (author) / LI HONGJIANG (author) / LIU WENBIN (author) / MU SEN (author) / BAI LULU (author) / WANG ZIJIAN (author)
2024-10-11
Patent
Electronic Resource
Chinese
Ship lock water delivery gallery and construction method thereof
European Patent Office | 2023
|Ship lock head short gallery arrangement structure and lock head arrangement structure
European Patent Office | 2022
|Construction method for newly building water-saving ship lock beside built ship lock
European Patent Office | 2024
|