Concrete structure earth cave dwelling construction method
The invention relates to the field of building construction and construction, in particular to a concrete structure earth cave dwelling construction method. The method comprises the following steps: firstly, selecting a soil wall surface with firm soil mass, and trimming the wall surface into a vertical wall body which is vertical to 90 degrees; then, a first section of concrete structure is constructed, a cave dwelling contour is drawn on the vertical wall, a groove is dug between the two contour lines to form a cave dwelling contour groove, the double-layer reinforcing mesh is stuffed into the contour groove, then the outer opening portion of the contour groove is sealed by pouring concrete, soil on the inner side of the concrete pouring range is dug away, and the cave dwelling contour groove is formed; forming a first section of concrete structure; continuously constructing a second section of concrete structure, a fourth section to an nth section by adopting the same method, and finally constructing the back wall into a wall body by adopting fly ash bricks, and connecting and sealing the wall body with the concrete side body; according to the construction method, the safety of the overall structure of the earth cave dwelling is enhanced, and the anti-seismic, damp-proof and insect-proof functions are improved. And the problem of indoor living conditions is greatly solved.
本发明涉及建筑物构造及施工领域,具体涉及一种混凝土结构土窑洞施工方法;首先,选择一面土体结实的土墙面,将所述墙面修整成垂直90度的立面墙体;然后,施工第一段混凝土结构,在立面墙体上放线画出窑洞轮廓,将轮廓线双线之间挖槽,形成窑洞的轮廓槽,将双层钢筋网片塞入轮廓槽内部,然后通过浇筑混凝土封闭轮廓槽外侧开口部位,将混凝土浇筑范围内侧部土体挖除,形成第一段混凝土结构;采用相同的方法继续施工第二段混凝土结构、第四段至第n段,最后采用粉煤灰砖将后背墙砌筑成墙身,并与混凝土侧身连接密封好;本发明施工方法加强了土窑洞的整体结构安全性,提高了抗震和防潮、防虫功能。大大的解决了室内居住条件。
Concrete structure earth cave dwelling construction method
The invention relates to the field of building construction and construction, in particular to a concrete structure earth cave dwelling construction method. The method comprises the following steps: firstly, selecting a soil wall surface with firm soil mass, and trimming the wall surface into a vertical wall body which is vertical to 90 degrees; then, a first section of concrete structure is constructed, a cave dwelling contour is drawn on the vertical wall, a groove is dug between the two contour lines to form a cave dwelling contour groove, the double-layer reinforcing mesh is stuffed into the contour groove, then the outer opening portion of the contour groove is sealed by pouring concrete, soil on the inner side of the concrete pouring range is dug away, and the cave dwelling contour groove is formed; forming a first section of concrete structure; continuously constructing a second section of concrete structure, a fourth section to an nth section by adopting the same method, and finally constructing the back wall into a wall body by adopting fly ash bricks, and connecting and sealing the wall body with the concrete side body; according to the construction method, the safety of the overall structure of the earth cave dwelling is enhanced, and the anti-seismic, damp-proof and insect-proof functions are improved. And the problem of indoor living conditions is greatly solved.
本发明涉及建筑物构造及施工领域,具体涉及一种混凝土结构土窑洞施工方法;首先,选择一面土体结实的土墙面,将所述墙面修整成垂直90度的立面墙体;然后,施工第一段混凝土结构,在立面墙体上放线画出窑洞轮廓,将轮廓线双线之间挖槽,形成窑洞的轮廓槽,将双层钢筋网片塞入轮廓槽内部,然后通过浇筑混凝土封闭轮廓槽外侧开口部位,将混凝土浇筑范围内侧部土体挖除,形成第一段混凝土结构;采用相同的方法继续施工第二段混凝土结构、第四段至第n段,最后采用粉煤灰砖将后背墙砌筑成墙身,并与混凝土侧身连接密封好;本发明施工方法加强了土窑洞的整体结构安全性,提高了抗震和防潮、防虫功能。大大的解决了室内居住条件。
Concrete structure earth cave dwelling construction method
一种混凝土结构土窑洞施工方法
BAI WENQING (author) / ZHANG RENJIAN (author) / ZHANG XUELONG (author) / LI JUNYING (author) / LYU JIAN (author)
2024-10-11
Patent
Electronic Resource
Chinese
Wiley | 2014
|European Patent Office | 2021
|British Library Conference Proceedings | 1999
|