Multi-section type construction method for underground pipe gallery
The invention discloses a multi-section type construction method for an underground pipe gallery. According to the technical scheme, the multi-section type construction method is characterized by comprising the steps of route planning, route segmentation, prefabricated part storage, prefabricated assembly section construction, cast-in-place section construction and foundation pit backfilling. A long-distance construction route is divided into a plurality of cast-in-place sections and a plurality of prefabricated assembly sections in a route segmentation stage, and the prefabricated assembly sections are constructed according to a construction sequence, so that the long-time large influence on traffic of residents around the route is reduced; and the construction length of each prefabricated assembly section is shortened, so that the precision error caused by manual construction is reduced, and the construction quality and the construction efficiency are improved.
本发明公开了一种地下管廊多段式施工方法,其技术方案要点包括路线规划、路线分段、预制构件储备、预制拼装段施工、现浇段施工以及基坑回填;通过在路线分段阶段将长距离施工路线分为多段现浇段与多段预制拼装段,并按照施工顺序先对多段预制拼装段进行施工,从而降低了路线周围居民交通产生长时间的较大影响;并且缩短了每段预制拼装段的施工长度,从而减少了人为施工带来的精度误差,提高了施工质量及施工效率。
Multi-section type construction method for underground pipe gallery
The invention discloses a multi-section type construction method for an underground pipe gallery. According to the technical scheme, the multi-section type construction method is characterized by comprising the steps of route planning, route segmentation, prefabricated part storage, prefabricated assembly section construction, cast-in-place section construction and foundation pit backfilling. A long-distance construction route is divided into a plurality of cast-in-place sections and a plurality of prefabricated assembly sections in a route segmentation stage, and the prefabricated assembly sections are constructed according to a construction sequence, so that the long-time large influence on traffic of residents around the route is reduced; and the construction length of each prefabricated assembly section is shortened, so that the precision error caused by manual construction is reduced, and the construction quality and the construction efficiency are improved.
本发明公开了一种地下管廊多段式施工方法,其技术方案要点包括路线规划、路线分段、预制构件储备、预制拼装段施工、现浇段施工以及基坑回填;通过在路线分段阶段将长距离施工路线分为多段现浇段与多段预制拼装段,并按照施工顺序先对多段预制拼装段进行施工,从而降低了路线周围居民交通产生长时间的较大影响;并且缩短了每段预制拼装段的施工长度,从而减少了人为施工带来的精度误差,提高了施工质量及施工效率。
Multi-section type construction method for underground pipe gallery
一种地下管廊多段式施工方法
YANG TAIQIN (author) / YANG JUN (author) / YAN GANG (author)
2024-10-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2016
|Underground excavation construction method for multi-cabin pipe gallery
European Patent Office | 2022
|Underground pipe gallery construction equipment and construction method
European Patent Office | 2023
|Construction technology for underground pipe gallery construction
European Patent Office | 2023
|