A platform for research: civil engineering, architecture and urbanism
Cooling tower cooling water supply system and method with pure water supply function
The invention provides a cooling tower cooling water supply system and method with pure water replenishment, the cooling tower cooling water supply system comprises a cooling tower, a cooling tower cooling water supply pipeline, a tap water supply unit and a pure water supply unit, and the cooling tower is connected with the tap water supply unit and the pure water supply unit through the cooling tower cooling water supply pipeline; the tap water supply unit comprises a tap water pipe which is connected with a tap water room and a cooling tower cooling water supply pipeline, and a stop valve is mounted on the tap water pipe; the pure water supply unit comprises a pure water supply pipeline, a pure water supply pipeline valve, a closed water tank and a pure water room, the cooling tower cooling water supply pipeline, the closed water tank and the pure water room are sequentially connected through the pure water supply pipeline, and the pure water supply pipeline is provided with the pure water supply pipeline valve; the closed water tank is arranged on the lower portion of the cooling tower so as to collect cooling water falling from the cooling tower, and pure water is adopted for assisting water supply, so that the operation cost of the cooling tower is reduced.
本发明提供一种带有纯水补给的冷却塔冷却水供水系统及方法,包括:冷却塔、冷却塔冷却水供水管路、自来水供水单元以及纯水供水单元,冷却塔通过冷却塔冷却水供水管路分别与自来水供水单元、纯水供水单元连接;自来水供水单元包括自来水管,自来水管连接自来水房与冷却塔冷却水供水管路,自来水管上安装有切断阀;纯水供水单元包括纯水供水管路、纯水供水管路阀门、密闭水池以及纯水房,冷却塔冷却水供水管路、密闭水池以及纯水房之间通过纯水供水管路依次连接,纯水供水管路上设置有纯水供水管路阀门;密闭水池设于冷却塔的下部,以汇集从冷却塔落下的冷却水,本发明通过采用纯水辅助供水从而降低冷却塔的运营成本。
Cooling tower cooling water supply system and method with pure water supply function
The invention provides a cooling tower cooling water supply system and method with pure water replenishment, the cooling tower cooling water supply system comprises a cooling tower, a cooling tower cooling water supply pipeline, a tap water supply unit and a pure water supply unit, and the cooling tower is connected with the tap water supply unit and the pure water supply unit through the cooling tower cooling water supply pipeline; the tap water supply unit comprises a tap water pipe which is connected with a tap water room and a cooling tower cooling water supply pipeline, and a stop valve is mounted on the tap water pipe; the pure water supply unit comprises a pure water supply pipeline, a pure water supply pipeline valve, a closed water tank and a pure water room, the cooling tower cooling water supply pipeline, the closed water tank and the pure water room are sequentially connected through the pure water supply pipeline, and the pure water supply pipeline is provided with the pure water supply pipeline valve; the closed water tank is arranged on the lower portion of the cooling tower so as to collect cooling water falling from the cooling tower, and pure water is adopted for assisting water supply, so that the operation cost of the cooling tower is reduced.
本发明提供一种带有纯水补给的冷却塔冷却水供水系统及方法,包括:冷却塔、冷却塔冷却水供水管路、自来水供水单元以及纯水供水单元,冷却塔通过冷却塔冷却水供水管路分别与自来水供水单元、纯水供水单元连接;自来水供水单元包括自来水管,自来水管连接自来水房与冷却塔冷却水供水管路,自来水管上安装有切断阀;纯水供水单元包括纯水供水管路、纯水供水管路阀门、密闭水池以及纯水房,冷却塔冷却水供水管路、密闭水池以及纯水房之间通过纯水供水管路依次连接,纯水供水管路上设置有纯水供水管路阀门;密闭水池设于冷却塔的下部,以汇集从冷却塔落下的冷却水,本发明通过采用纯水辅助供水从而降低冷却塔的运营成本。
Cooling tower cooling water supply system and method with pure water supply function
带有纯水补给的冷却塔冷却水供水系统及方法
DONG LIPING (author) / WANG LIGUANG (author) / MA YUHUAI (author) / RUI YANG (author) / CAO QIGANG (author) / ZHAO NA (author) / BAI YUAN (author) / NI HAORAN (author)
2024-10-22
Patent
Electronic Resource
Chinese
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
Tema Archive | 1973
|Multi-water-tower water supply system and water supply method
European Patent Office | 2021
|Water supply cooling circulation system and control method thereof
European Patent Office | 2024
|